flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BIM on Target

BIM on Target

By using BIM for the design of its new San Clemente, Calif., store, big-box retailer Target has been able to model the entire structural steel package, including joists, in 3D, chopping the timeline for shop drawings from as much as 10 weeks down to an ‘unheard of’ three-and-a-half weeks.


By By Jeff Yoders, Contributing Editor | January 7, 2011
This article first appeared in the January 2011 issue of BD+C.

Minneapolis-based Target Corp. has always put the design of its stores high up on its list of corporate priorities. Target was one of the original participants in the U.S Green Building Council’s Pilot Portfolio certification program, which allows prototype designs of multiple similar buildings to be LEED-certified as variations of a single prototype. Five Target stores have been LEED-certified to date.

Over the last year Target fully transitioned its new store design from 2D (using Bentley Microstation) to 3D (utilizing the Autodesk Revit BIM platform). Early in 2010, as Target began planning a new 142,206-sf store for San Clemente, Calif., the retailer decided to take prototype design to an even higher level, using both 3D BIM and integrated project delivery.

“Right now we maintain a general merchandise P [for “prototype”] store,” said Brad Koland, group manager of structural engineering at Target. However, this month the company will be releasing its Revit prototype. “Right now it doesn’t really get to a deeper level of integration,” said Koland. “We’re trying to find out the viability of how deeply embedded we can take this 3D information into our prototype.”

One goal of the San Clemente investigation was to figure out how better to utilize the space around the structural steel joists in its stores, space that typically houses some HVAC and electrical lines. There is a sense among Target’s architects and engineers that this space could be used more effectively if they were to know early enough in the design process exactly where the joist web framing lays out, so that they could plan how pipes, ducts, and electrical lines would go around them. Koland said Target’s Building Teams need to know how all the elements of the steel joists and the joist girders come into play early in the design phase to effectively utilize that space.

“With BIM analysis tools we knew we could reduce conflicts and increase utilization of the space within our box,” said Koland. “We wanted to move beyond that. We wanted to use BIM as a way to figure out what was in there, and then establish that and build in protocols for how we could start to utilize that space to reduce the height of our buildings, or maximize the amount of space we have, or minimize the amount of structure we have to put up.”

To do that, the integrated team on the San Clemente store—including IPD engineer and steel detailer Meyer Borgman Johnson (MBJ), general contractor Whiting-Turner, and the in-house architects and engineers at Target—met at strategic times near the end of the design phase of the Orange County store. Whiting-Turner created a comprehensive virtual design and construction (VDC) execution plan that was sent out as part of the bidding package for all subcontractors. It defined what Whiting-Turner would be providing, what was expected of each subcontractor, and why and how the 3D model would be used. Because the joist design was such an important part of the overall process, bidding was opened in September for the steel joist fabrication package. The pre-qualification process included a requirement to work as an integrated team using a parametric 3D model.

The steel joist fabrication package went to New Millennium Building Systems, largely because of its BIM capabilities. MBJ created a construction BIM model using Target’s Revit model as a starting point, converting to Tekla Structures using the IFC file format. After quality control checking, this model was delivered to New Millennium in lieu of 2D drawings. The structural joist fabricator was able to use the generic joist elements, rather than having to redraw them, to begin the process for exact steel joist design and modeling.

Using New Millennium’s Dynamic Joist design component, a plug-in for Tekla Structures that helps automate this integrated process, the Fort Wayne, Ind., fabricator was able to quickly design the steel joists, insert “real” fabrication-ready joists and bridge in the shared Tekla model, and produce 2D shop drawings. The geometry and profiles of the joists were determined by New Millennium’s design, detailing, and fabrication standards.

“The parametric Dynamic Joist plug-in will model a joist from user-specified points,” said Ricky Gillenwater, IT director at New Millennium and developer of the plug-in. “What users have initially is a generic representation of a joist, consisting of generic material and geometry. The component transforms into an as-built representation as it goes through the joist detailing and design process, which is what we gave MBJ.”

The time period from the award of the steel joist package to the approval of shop drawings sent back to New Millennium for fabrication from the integrated design team, including calculations and integrated 3D geometry, was three-and-half weeks.

“That’s unheard of to have an approved set of calculations and shop drawings back in the joist manufacturer’s hands ready for fabrication,” said Jerod Hoffman, principal and structural engineer at MBJ. Referring to the structural steel package (including miscellaneous metals), Hoffman said this is the first Target store ever bid to steel fabricators off of completed shop drawings.

“Instead of providing just 2D construction documents, we gave Whiting-Turner the model, the bill of materials that listed every nut and bolt, and approved shop drawings, which the fabricator could use to supersede the 2D drawings and specifications,” Hoffman said. “The hope is that because we’re providing them exact quantities, the quality, competitiveness, and value of the bids they receive will be better than using 2D design drawings only.” Hoffman says he expects “zero change orders” with regard to coordination issues in the steel because “they’ve all been worked out.”

Through the integrated design process, MBJ also discovered early on that some of the load-bearing steel joists had to be fabricated and scoped in a way that changed the original plan for the steel embeds in the store’s concrete walls. As a result, the new embeds were correctly put out on the bid documents for the structural steel and concrete packages and will, therefore, be bid on as an already-coordinated first competitive cost.

Grading and site work on the project began in late December, and Whiting-Turner is already working with its subcontractors on 4D scheduling and cost estimation. The contractor plans to use Navisworks to coordinate the Tekla Structures steel model, as well as other models for the mechanical, electrical, and other subcontractors. Although Revit is not the model being used to create shop drawings and other deliverables for the subcontractors, Whiting-Turner will use the Revit design model in conjunction with fabrication models to perform clash detection and check quality control.

 “The type of sub we’re seeing bid on the project is more sophisticated,” said Reema Zuberi, project manager and regional VDC coordinator at Whiting-Turner. “They are able to work with 3D models and are comfortable working together earlier in the process.”

The store is expected to be ready for its grand opening in October. BD+C

Target: Expanding BIM Design Horizons

Target’s in-house property development operation includes more than 60 architects, 80 engineers, and 30 construction managers. The retailer, with 1,743 stores in every state except Vermont, has cut back its new openings due to the weak economy, but still expects to open 30 new stores in 2011, including the San Clemente, Calif., project. Store design is overseen by senior vice president Rich Varda, an architect whose work outside of Target includes the recently opened Musical Instrument Museum in Phoenix.

Utilizing BIM and prototype designs for efficient design and construction is a key part of Target’s expansion strategy. “Twenty-ten was a demarcation from a 2D design deliverable to a fully 3D design for all store designs,” said Brad Koland, group manager of structural engineering at Target. “We definitely saw that the first incremental benefit of using Revit came from clash detection. There was a cost savings associated with moving from a 2D platform to a 3D one.”

Target has, over the years, experimented with many different ways of procuring construction materials. Getting a better idea of how to use the area around steel joists was one area where, Koland said, Target wanted to build a foundation of knowledge for what is possible.

“We have a really robust owner-provided construction material and equipment program,” he said. “We source some general construction materials but not too many. So, this isn’t necessarily a strong drive toward materials sourcing, but we wanted to see what technology would allow us to do. Sourcing is one of the possible outcomes, but really getting better clarity around what’s inside our building is the primary driver for this investigation.”

Related Stories

Government Buildings | Mar 24, 2023

19 federal buildings named GSA Design Awards winners

After a six-year hiatus, the U.S. General Services Administration late last year resumed its esteemed GSA Design Awards program. In all, 19 federal building projects nationwide were honored with 2022 GSA Design Awards, eight with Honor Awards and 11 with Citations.

Transportation & Parking Facilities | Mar 23, 2023

Amsterdam debuts underwater bicycle parking facility that can accommodate over 4,000 bikes

In February, Amsterdam saw the opening of a new underwater bicycle parking facility. Located in the heart of the city—next to Amsterdam Central Station and under the river IJ (Amsterdam’s waterfront)—the facility, dubbed IJboulevard, has parking spots for over 4,000 bicycles, freeing up space on the street.

Healthcare Facilities | Mar 22, 2023

New Jersey’s new surgical tower features state’s first intraoperative MRI system

Hackensack (N.J.) University Medical Center recently opened its 530,000-sf Helena Theurer Pavilion, a nine-story surgical and intensive care tower designed by RSC Architects and Page. The county’s first hospital, Hackensack University Medical Center, a 781-bed nonprofit teaching and research hospital, was founded in 1888.

Project + Process Innovation | Mar 22, 2023

Onsite prefabrication for healthcare construction: It's more than a process, it's a partnership

Prefabrication can help project teams navigate an uncertain market. GBBN's Mickey LeRoy, AIA, ACHA, LEED AP, explains the difference between onsite and offsite prefabrication methods for healthcare construction projects.

Women in Design+Construction | Mar 21, 2023

Two leading women in construction events unite in 2023

The new Women in Residential + Commercial Construction Conference (WIR+CC) will take place in Nashville, Tenn., October 25-27, 2023. Combining these two long-standing events aligns with our mission to create an event most impactful for women in the $1.4 trillion U.S. commercial and residential design and construction industry.

Mass Timber | Mar 19, 2023

A 100% mass timber construction project is under way in North Carolina

An office building 100% made from mass timber has started construction within the Live Oak Bank campus in Wilmington, N.C. The 67,000-sf structure, a joint building venture between the GCs Swinerton and Wilmington-headquartered Monteith Construction, is scheduled for completion in early 2024.

Sports and Recreational Facilities | Mar 17, 2023

Aurora, Colo., recreation center features city’s first indoor field house, unobstructed views of the Rocky Mountains

In January, design firm Populous and the City of Aurora, Colo. marked the opening of the Southeast Aurora Recreation Center and Fieldhouse. The 77,000-sf facility draws design inspiration from the nearby Rocky Mountains. With natural Douglas Fir structure and decking, the building aims to mimic the geography of a canyon. 

Architects | Mar 16, 2023

HKS launches partner diversity program to create a more diverse workforce and partnership network

Design firm HKS has launched a new partner diversity program that will work to build a more diverse AEC ecosystem. The HKS xBE program will give xBE firms (a term encompassing all disadvantaged businesses) and their members “access to opportunities to build relationships, pursue new work, and bolster innovation within the architecture and design professions,” according to HKS.

Sustainability | Mar 16, 2023

Lack of standards for carbon accounting hamper emissions reduction

A lack of universally accepted standards for collecting, managing, and storing greenhouse gas emissions data (i.e., carbon accounting) is holding back carbon reduction efforts, according to an essay published by the Rocky Mountain Institute.

Sports and Recreational Facilities | Mar 15, 2023

Georgia State University Convocation Center revitalizes long-neglected Atlanta neighborhood

Georgia State University’s new Convocation Center doubles the arena it replaces and is expected to give a shot in the arm to a long-neglected Atlanta neighborhood. The new 200,000 sf multi-use venue in the Summerhill area of Atlanta is the new home for the university’s men’s and women’s basketball teams and will also be used for large-scale academic and community events.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021