BIM has been paying off for AE firm NELSON. “Once a team becomes proficient in the BIM process, we see better margins for projects completed in Revit,” says John “Ozzie” Nelson, Jr., President/CEO. “We see more RFPs that require Revit.” Creating Revit models opens up doors in analysis, data integration, facilities management, and advanced visualization, he says.
Perkins Eastman is starting to see results from its investment in BIM. “Our most recent in-house analysis of project labor costs on comparable CAD/BIM projects is showing an increase in BIM projects over CAD projects,” says Chair/CEO Bradford Perkins, FAIA, MRAIC, AICP. “Many of the other benefits of a BIM workflow are not so easily quantified, but they are real enough to give us confidence that BIM is paying off.”
SCROLL DOWN FOR GIANTS 300 BIM FIRM RANKINGS
Alex Ivanikiw, AIA, LEED AP, Senior Vice President at Barton Malow: “The real benefit is how the use of BIM enables collaboration, which in turn builds a real sense of trust and teamwork.” When subcontractors had trouble using the BIM model for submittal approval and materials fabrication, Barton Malow created a BIM 101 seminar to educate them in these processes, says Ivanikiw.
BIM projects have been profitable for Syska Hennessy Group, but there’s always room for improvement, says Co-president Gary Brennen, PE, LEED AP. SHG was “committed and fully invested in the early adoption of BIM,” but the MEP software still lags behind the architectural and structural components. “We were aware of that going into the process,” he says.
Structural engineering firm Magnusson Klemencic Associates is producing 100% of its projects as BIM models. “After many years of investment, we are finally turning the corner on implementing BIM in an efficient and thoughtful manner,” says MKA President Ron Klemencic, PE, SE.
The key to successful BIM implementation: “A project team with the experience and knowledge of what to model and how to model it,” says Klemencic.
“Allowing owners to better visualize the project has become an influencing factor during the presentation process,” says Doug Davidson, President, New South Construction. In 2011, over 45% of New South’s projects used BIM.
“There’s no question that BIM has paid off in our role as engineer of record producing construction drawings and as detailing engineer,” says Robert Otani, PE, LEED AP, Vice President of Thornton Tomasetti. The firm’s Construction Support Services practice uses BIM to produce digital fabrication drawings, connection engineering, and erection engineering for steel contractors. “The technology is constantly changing, and the engineers need to stay ahead of the curve,” says Otani.
KJWW Engineering recently standardized on Revit BIM in all 11 offices. President Paul VanDuyne, PE, says it was much more difficult to develop the MEP and technology components of the firm’s BIM platform than it was for structural engineering and medical equipment planning. “Now we are completing projects in close to the same time frame as previously with 3D, and in some cases faster,” he says.
EwingCole now uses an internal “cloud” for team members, who are now able to work on BIM through higher-end processors and central servers, says President Mark Hebden, AIA, LEED AP.
EYP Architecture & Engineering adopted BIM in 2006, and it has become a core competency. One unexpected benefit: “BIM integration has created more opportunities for younger tech-savvy staff to collaborate with senior technical team members,” says John Pocorobba, AIA, NCARB, LEED AP, Chief Operations Officer.
“It becomes apparent which market sectors are embracing BIM,” said Greg Lyon, Vice President and Director of Business Development at Nadel Architects, whose BIM work focuses on hospitality and retail clients.
“BIM implementation has been a long-term effort and a considerable one,” says Phil Harrison, FAIA, LEED AP, CEO of Perkins+Will. The firm has overcome the technical and training issues and is now “focusing on innovations and efficiencies,” he says.
Shepley Bulfinch has been using BIM since 2009 and now uses it for all projects. President Carole Wedge, FAIA, LEED AP, says BIM implementation has led to a “deeper exploration about how we approach our work, including how we draw and how we schedule our projects.”
According to Graef CEO John Kissinger, “We were early adopters. It was more difficult than we thought, but it is ingrained in all areas of our practice now.”
SmithGroupJJR began transitioning to Revit in 2005, and is now demonstrating a return on its BIM investment. On a daily basis, the firm peaks at around 310 concurrent users on Revit Architecture, Revit MEP, and Revit Structure.
President Steven Straus says Glumac made “an enormous investment” in BIM training and software development. “BIM is a new technology that is improving coordination,” he says, “but the software is not ready for prime time.”
“Not all contractors we work with are leveraging BIM. This means we have to spend more time preparing drawings in BIM than we normally would,” says BRPH President/CEO Brad Harmsen, AIA.
The chief conclusion from this survey: BIM is here to stay, but be prepared to invest staff time and money to perfect it. +
TOP 25 BIM ARCHITECTURE FIRMS
Rank | Company | 2011 BIM Revenue ($) |
1 | HOK | 398,217,301 |
2 | HDR Architecture | 327,690,000 |
3 | Perkins+Will | 274,336,000 |
4 | Skidmore, Owings & Merrill | 204,000,000 |
5 | HKS | 200,000,000 |
6 | Cannon Design | 173,000,000 |
7 | SmithGroupJJR | 150,540,000 |
8 | RTKL Associates | 140,000,000 |
9 | Hammel, Green and Abrahamson | 76,740,000 |
10 | EYP Architecture & Engineering | 72,681,105 |
11 | Corgan Associates | 67,575,000 |
12 | Flad Architects | 65,100,000 |
13 | HNTB Architecture | 63,244,852 |
14 | Fentress Architects | 58,824,000 |
15 | DLR Group | 49,500,000 |
16 | BSA LifeStructures | 45,316,495 |
17 | PageSoutherlandPage | 44,918,630 |
18 | ZGF Architects | 40,352,152 |
19 | Ennead Architects | 39,341,000 |
20 | KMD Architects | 35,143,453 |
21 | Cooper Carry | 34,000,000 |
22 | Perkins Eastman | 32,500,000 |
23 | LS3P Associates | 32,211,134 |
24 | FKP Architects | 30,000,000 |
25 | Harley Ellis Devereaux | 28,740,000 |
TOP 25 BIM ENGINEERING FIRMS
Rank | Company | 2011 BIM Revenue ($) |
1 | Jacobs | 355,021,036 |
2 | URS Corp. | 275,000,000 |
3 | Stantec | 181,300,000 |
4 | SSOE Group | 103,506,950 |
5 | Science Applications International Corp. | 92,695,000 |
6 | Thornton Tomasetti | 83,314,632 |
7 | KPFF Consulting Engineers | 60,000,000 |
8 | Burns & McDonnell | 50,000,000 |
9 | KJWW Engineering Consultants | 43,784,892 |
10 | Bard, Rao + Athanas Consulting Engineers | 32,000,000 |
11 | H&A Architects & Engineers | 29,883,975 |
12 | TLC Engineering for Architecture | 27,290,274 |
13 | STV | 26,646,000 |
14 | Glumac | 26,408,740 |
15 | Magnusson Klemencic Associates | 25,845,578 |
16 | Middough | 25,000,000 |
17 | R.G. Vanderweil Engineers | 24,912,000 |
18 | Michael Baker Jr., Inc | 24,000,000 |
19 | Syska Hennessy Group | 23,500,000 |
20 | Smith Seckman Reid | 21,360,000 |
21 | Bergmann Associates | 18,420,000 |
22 | ccrd partners | 16,700,000 |
23 | Rutherford & Chekene | 16,568,000 |
24 | Paulus, Sokolowski and Sartor | 15,500,000 |
25 | L.R. Kimball | 14,200,000 |
TOP 25 BIM CONSTRUCTION FIRMS
Rank | Company | 2011 BIM Revenue ($) |
1 | Turner Corporation, The | 5,458,100,812 |
2 | URS Corp. | 4,150,000,000 |
3 | Hensel Phelps Construction | 2,230,890,000 |
4 | Mortenson | 2,220,000,000 |
5 | Balfour Beatty US | 2,070,776,637 |
6 | McCarthy Holdings | 1,897,000,000 |
7 | Holder Construction | 1,651,000,000 |
8 | Whiting-Turner Contracting Co., The | 1,282,424,019 |
9 | Lend Lease | 1,264,115,151 |
10 | Hoffman Corp. | 1,165,887,387 |
11 | Walsh Group, The | 1,128,436,530 |
12 | PCL Construction Enterprises | 1,100,346,901 |
13 | JE Dunn Construction | 1,097,865,953 |
14 | Clayco | 820,000,000 |
15 | DPR Construction | 691,319,178 |
16 | Swinerton | 653,859,000 |
17 | Gilbane Building Co. | 622,414,000 |
18 | Suffolk Construction | 621,498,214 |
19 | Structure Tone | 606,850,000 |
20 | Pepper Construction Group | 566,300,000 |
21 | Weitz Co., The | 560,000,000 |
22 | Manhattan Construction Group | 549,029,000 |
23 | Austin Industries | 547,065,203 |
24 | Power Construction | 530,000,000 |
25 | Brasfield & Gorrie | 504,676,926 |
Related Stories
| Aug 18, 2014
SPARK’s newly unveiled mixed-use development references China's flowing hillscape
Architecture firm SPARK recently finished a design for a new development in Shenzhen. The 770,700 square-foot mixed-use structure's design mimics the hilly landscape of the site's locale.
| Aug 18, 2014
Seaside luxury: Arquitectonica, Melo Group introduce Aria on the Bay condo tower in Miami
Melo Group has launched sales for Aria on the Bay, its new 647-unit luxury condominium in Miami. The bayfront condo will overlook Margaret Pace Park, Biscayne Bay and the Miami Beach skyline.
Sponsored | | Aug 16, 2014
Fire-rated framing system makes the grade at Johnson & Wales University Center
The precision engineering of TGP’s Fireframes Aluminum Series creates narrow profiles and crisp sightlines at Johnson & Wales University Center for Physician Assistant Studies
| Aug 16, 2014
Decoupling the professional services firm
Business consultant Tim Williams authored a recent LinkedIn post that highlights the emerging trend among professional services firms toward “decoupling,” or consciously separating the high-value services that are scarce from the low-value services that are plentiful. SPONSORED CONTENT
| Aug 16, 2014
The science of learning: Designing the STEM learning facilities of the future
New technology and changing pedagogies are influencing how to best teach a generation of learners who have never known a world without smartphones or tablets, writes HOK's Kimberly Robidoux.
| Aug 16, 2014
Calatrava in hot water again? Famed architect charged to appear in court in Spanish construction case
The Valencia High Court has requested documents detailing how Calatrava was hired in private, without any publicity, for a convention center project in Castellon. For contracts over a certain minimum value, that is illegal in Spain.
| Aug 15, 2014
First look: RMJM’s 'jumping fish' tower design for the Chinese Riviera
The tower's fish-jumping gesture is meant to symbolize the prosperity and rapid transformation of Zhuhai, China.
| Aug 15, 2014
Periscope structure gives public toilet an unobstructed sea view
Polish architect Adam Wiercinski designs a public toilet with a periscope mechanism that gives visitors unobstructed views of the sea.
| Aug 14, 2014
8 do's and don'ts for completing an HVAC life cycle cost assessment
There are many hurdles to overcome when completing a life cycle cost assessment. RMF Engineering’s Seth Spangler offers some words of advice regarding LCCAs.
| Aug 14, 2014
Life cycle cost analysis using energy modeling
A life cycle cost analysis helps a school district decide which HVAC system to use in $198 million worth of future building projects.