flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BIM in the academy

BIM in the academy

Lessons for the AEC industry.


By By John Tocci, Jr. | May 7, 2012
This article first appeared in the May 2012 issue of BD+C.

As BIM continues to exert its explosive impact on the AEC industry, one component that has been comparatively quiet is academia, specifically the world of architectural education. BIM in Academia looks to reevaluate BIM’s place in the architectural education world—the Academy, as it is referred to in the book. The book, edited by Peggy Deamer, AIA, and Phillip G. Bernstein, FAIA, both of whom teach at the Yale School of Architecture (Bernstein is also a vice president at Autodesk, maker of the Revit BIM platform), examines the questions raised by having BIM in an academic setting and provides BIM case studies from faculty at a number of U.S. architecture schools. Although unabashedly written by academics for academia, the book has several noteworthy themes that cross over between the AEC industry and the Academy.

ARCHITECTURE STUDENTS, VDC, AND THE AEC INDUSTRY

One of these has to do with why VDC-enabled construction firms are seeking out the graduates of architecture schools. The fact is that a number of construction companies (including Gilbane, where I work) are hiring architecture graduates because the curricula and highly demanding class loads of these programs make their graduates ideal candidates for VDC projects. As a VDC manager myself, I have found that architecture graduates often make fantastic VDC professionals. They also find this role highly fulfilling. Asked why he liked doing VDC at a construction firm, a recent MArch graduate replied, “One of the most rewarding aspects of the VDC industry is our influence on how designers and builders interact.” This is exactly the sort of answer one would hope for from the people who are best suited for BIM’s collaborative environment.

The supply of talented VDC candidates still does not meet the demand—a gap that will only widen as the industry recovers and project loads increase. That’s why AEC industry professionals who focus on advanced VDC implementation are eagerly watching developments related to the Academy’s evolving relationship with BIM.

Furthermore, with the unemployment rate for new architectural graduates at nearly 15%, and with professional internships at design firms few and far between, there is a dire need for architecture students to make themselves as marketable as possible. Employers—design and construction firms alike—are looking for new hires to be highly functional in extremely short periods of time. These demands put tremendous pressure on new architecture graduates.

Fluency in BIM can be a critical differentiator for a new graduate. If the Academy truly wishes to see its recent graduates thrive in the AEC industry, making BIM an integral part of the curriculum is imperative. This also creates an opportunity for the profession (both design and construction) to positively engage with Academia to provide lessons learned, technical expertise, and best practices in BIM and VDC.

If there is a single valuable takeaway from BIM in Academia, it is that the Academy is moving beyond “Should we be involved in BIM?” to clearly addressing more functional concerns around “How do we integrate BIM into the curriculum?” The institutions that are producing the next generation of architects and VDC professionals are in the beginning stages of a curriculum revolution that can have the long-term impact akin to that of Walter Gropius’s Bauhaus School.

This shifting attitude in many ways mirrors how the industry and individual firms adopt BIM. It usually starts out as a process where the firm attempts to understand the ramifications of BIM, what resources BIM implementation requires, and how BIM fits into their particular business model. As the firm begins using the tool on projects, the question becomes “How do we improve or reinvent what we’re doing?”

The recent BIMForum meeting that focused on VDC deliverables across the AECO market also concluded that, as an industry, we’re beyond “Should we?” and are now entering a period of rapid growth centered on how to implement BIM most effectively.

The contributors to BIM in Academia and AEC industry professionals agree on one thing: Change is here, and more change is coming. “BIM threatens all hierarchies,” the book states, and this holds true for both academic and professional settings. After a firm pushes seriously into VDC, nothing is untouched. From the early design phase in an architectural firm, to building turnover at a construction management firm, standard business practice changes when integrating BIM. Such change isn’t always comfortable, easy, or smooth, as the numerous case studies in the book (and in real practice) demonstrate.

Many practicing designers fear that BIM is a homogenizing tool that inflicts a limited set of parametric tools on the project, takes the designer out of the driver’s seat, and replaces the professional with a set of soulless mathematical constraints. This is a common topic of discussion, both in the Academy and in design firms.

The above statement is true to some extent, but only insofar that it is true that a mechanical pencil—an earlier “soulless tool”—can manipulate the design process. Such is the case only if the person operating the pencil isn’t capable of using it effectively. The same argument applies to BIM software.

Fluency with the best tools for the job is critical, but lack of operator capability should not be confused with perceived deficiencies of the software. Look no further than the AIA-award-winning work of the parametric wizards at CASE Design in New York City to appreciate how BIM tools can allow the realization of pure design. These BIM tools are so flexible that they are used for modeling the sets of blockbuster movies the likes of “The Fantastic Four” and “The Watchmen.”

WILL THE REAL MASTER BUILDER PLEASE STAND UP?

One question that the book touches on, and which often comes up in industry discussions of BIM and IPD, is “Who is the master builder, and how does BIM fit into that role?” With the advent of BIM, the master builder is now is the whole team. At last December’s AIA Student Chapter National Forum, two Gilbane VDC engineers presented a discussion of how the role of the master builder has evolved and where they see it headed. What is interesting about these two VDC professionals is that they are both IDP-logging, card-carrying Associate AIA architecture interns. Although their professional affiliation is obviously not an objective source, they argued that BIM and VDC tools are pulling the “master builder team” together in a cohesive way after a more than 40-year period of separation. An important component of this trend is the advent of highly collaborative project delivery methods like Construction Management at Risk with Design Assist and various types of IPD contracts that are critical to making the team-based master builder concept work.

THE ONGOING SEARCH FOR THE RIGHT PEOPLE

In his essay, John I. Messner, PhD, an associate professor of architectural engineering at Penn State, wrote that the AEC industry needs more “T-shaped people” on such composite BIM/VDC teams. T-shaped people have a broad field of knowledge across disciplines, with great depth of expertise in a single field. Finding such T-shaped team members is a critical step for any AEC company looking to start, expand, or assemble a VDC-enabled organization. Implementing such a strategy will create the best building project teams.

BIM in Academia suggests several possible routes—much like those AEC firms are taking—for the Academy to accelerate the development and integration of BIM/VDC into their programs. The industry-leading BIM/VDC firms are already starting to push BIM tools into the hands of field and office staff alike, as well as assigning traditional project roles like assistant project manager or project engineer to VDC staff members.

From my reading of BIM in Academia, it is clear that the front-running academic institutions are not far behind professional practice in BIM thinking: the sooner they catch up, the better the AEC industry will be for it. AEC industry professionals with BIM/VDC experience have a responsibility to provide feedback, assistance, and resources to make sure that our most critical supplier, the Academy, continues to provide the human capital necessary to sustain the integration of VDC into the design and construction industry. BD+C
--
John Tocci, Jr., is Manager of Virtual Design and Construction at Gilbane Building Company and a BD+C “40 under 40” honoree.

Related Stories

| Jun 30, 2014

Research finds continued growth of design-build throughout United States

New research findings indicate that for the first time more than half of projects above $10 million are being completed through design-build project delivery. 

| Jun 30, 2014

Narrow San Francisco lots to be developed into micro-units

As a solution to San Francisco’s density and low housing supply compared to demand, local firms Build Inc. and Macy Architecture each are to build micro-unit housing in a small parcel of land in Hayes Valley.

| Jun 30, 2014

Arup's vision of the future of rail: driverless trains, maintenance drones, and automatic freight delivery

In its Future of Rail 2050 report, Arup reveals a vision of the future of rail travel in light of trends such as urban population growth, climate change, and emerging technologies. 

| Jun 30, 2014

4 design concepts that remake the urban farmer's market

The American Institute of Architects held a competition to solve the farmer's markets' biggest design dilemma: lightweight, bland canopies that although convenient, does not protect much from the elements.

| Jun 30, 2014

Harvard releases the State of the Nation’s Housing 2014

Although the housing industry saw notable increases in construction, home prices, and sales in 2013, household growth has yet to fully recover from the effects of the recession, according to a new Harvard University report. 

| Jun 30, 2014

OMA's The Interlace honored as one of the world's most 'community-friendly' high-rises

The 1,040-unit apartment complex in Singapore has won the inaugural Urban Habitat award from the Council on Tall Buildings and Urban Habitat, which highlights projects that demonstrate a positive contribution to the surrounding environment.

| Jun 30, 2014

Work starts on Jean Nouvel-designed European Patent Office in the Netherlands [slideshow]

With around 80,000 sm and a budget of €205 million self-financed by the EPO, the complex will be one of the biggest office construction sites ever in the Netherlands. 

| Jun 30, 2014

Growth of crowdfunding, public-private partnerships among top trends in architecture marketplace

A new report by the American Institute of Architects highlights several emerging trends in the architecture marketplace, including the growth of the P3 project delivery model and designing for health. 

| Jun 30, 2014

Report recommends making infrastructure upgrades a cabinet-level priority

The ASCE estimates that $3.6 trillion must be invested by 2020 to make critically needed upgrades and expansions of national infrastructure—and avoid trillions of dollars in lost business sales, exports, disposable income, and GDP. 

| Jun 30, 2014

Gen X, not Baby Boomers, spending the most money on homes [infographic]

It turns out that Generation X, who have the highest incomes of the three generations surveyed, are paying the highest home payments and tend to have the largest households. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021