BIM 2.0: AEC firms share their vision for the great leap forward in BIM/VDC implementation [2013 Giants 300 Report]

BIM 2.0: AEC firms share their vision for the great leap forward in BIM/VDC implementation [2013 Giants 300 Report]

We reached out to dozens of AEC firms that made our annual BIM Giants lists and asked one simple question: What does BIM 2.0 look like to you? Here’s what they had to offer.


By David Barista, Editor-in-Chief | July 19, 2013
SmithGroupJJR used BIM with its design of the 230,000-sf Facility for Rare Isoto
SmithGroupJJR used BIM with its design of the 230,000-sf Facility for Rare Isotope Beams (FRIB) at Michigan State University. The level of detail and coordination required from each of the firms disciplines was unprecedented. FRIB will be a new national user facility for nuclear science, funded by the Department of Energy Office of Science, Michigan State University, and the state of Michigan. PHOTO: SMITHGROUPJJR

Automated clash detection. Been there, done that. Quantity takeoffs. Mastered it. Virtual construction coordination. Old news.

More than 25 years after the first BIM software tools came to market, the U.S. construction industry has largely mastered the BIM/VDC learning curve and is implementing 3D BIM coordination on a regular basis. According to Building Design+Construction’s 2013 Giants 300 survey, 80% of the nation’s largest architecture, engineering, and construction firms have adopted BIM/VDC tools and report having earned revenue working on BIM-driven projects.

Let’s face it: Most of what’s discussed in the BIM/VDC arena today is yesterday’s news. So BD+C set out to identify the next big developments in BIM/VDC technology and implementation. We reached out to dozens of AEC firms that made our annual BIM Giants lists and asked one simple question: What does BIM 2.0 look like to you? Here’s what they had to offer:

 

Precise field-placing using robotic total stations

Structural steel items embedded in cast-in-place concrete are often misaligned or omitted in the field due to poor coordination between the structural engineer, concrete subcontractor, and steel erector. In a broader sense, the use of meta data in a building model promises great benefits, but it has not found a place in general practice because of questions of accuracy, responsibility, and liability for use of the data.

TOP BIM ARCHITECTURE FIRMS

 
2012 BIM Revenue ($)
1 Gensler $484,286,130
2 HOK $385,700,000
3 HDR Architecture $299,828,000
4 Perkins+Will $270,225,000
5 Skidmore, Owings & Merrill $267,601,700
6 HKS $216,000,000
7 Stantec $197,000,000
8 Cannon Design $165,000,000
9 RTKL $131,834,9509
10 SmithGroupJJR $105,598,000
11 EYP $85,381,169

TOP BIM ENGINEERING FIRMS

 
2012 BIM Revenue ($)
1 Jacobs Engineering Group $4,465,746,000
2 URS Corp. $292,864,749
3 Science Applications International Corp. $131,066,235
4 Arup $123,364,028
5 Merrick & Co. $106,000,000
6 SSOE Group $99,560,561
7 Thornton Tomasetti $93,431,545
8 Buro Happold Consulting Engineers $78,006,000
9 Middough $60,000,000
9 KPFF Consulting Engineers $60,000,000

TOP BIM CONSTRUCTION FIRMS

 
2012 BIM Revenue ($)
1 Turner Corporation, The $5,924,000,000
2 Clark Group $2,224,508,127
3 DPR Construction $2,175,000,000
4 Hoffman Construction $2,155,377,276
5 Hensel Phelps $2,089,180,000
6 Mortenson Construction $1,992,450,000
7 Balfour Beatty $1,902,988,332
8 McCarthy Holdings $1,879,000,000
9 JE Dunn Construction $1,513,283,005
10 Walsh Group, The $1,313,656,333
Sophisticated field placement methods exist using equipment such as robotic total stations. In conjunction with geospatial data incorporated into the BIM model, these tools can be used to accurately place items and record their as-built condition to high precision.

Even though hardware and software are available today, we lack a standard practice outlining the responsibilities of each stakeholder to create, verify, and utilize geospatial data in the BIM model.

—Steve Wilkerson, Associate Vice President, Haynes Whaley Associates

 

Extracting data for FM operations

The next “big trend” in BIM is the set-up, coordination, and extraction of data in COBie (Construction Operations Building Information Exchange) format so that more information can be pulled from the BIM model for use in client-based FM software, such as Maximo and AiM. The primary obstacle is figuring out how to do this when so much information for a project resides in multiple models. Programs such as BIMLink will be developed to help with the management of these “data buckets” and with the flow of that data out of and back into BIM models.

This trend will also push the AEC industry closer together, and new ways of collaborating—such as IPD multiple-party, single-contract delivery methods—will continue to evolve to help remove the obstacles to integrating data from all of the necessary parties involved.

—Sam Boyd, Quality Assurance Director, Cooper Carry

 

BIM on the go

Mobility is becoming more important. Multi-disciplinary teams in multiple locations collaborating on one model will require faster data networks and the use of cloud computing. Take that to the next step and design teams will be expected to instantly communicate with the construction and fabrication in the field through the model in the cloud.

We’re also going to see teams untethered from their desktops using more mobile tools (tablets, smartphones, etc.) to modify, navigate, and display the model. We are starting to work with tools that allow us to open BIM models on an iPad or iPhone to share with clients on the go.

—Don Ghent, Principal and Global Technical Leader, Gensler

 

Creating a common BIM language

The Industry Foundation Classes (IFC) being developed by buildingSmart International will eventually define actual data elements of a building model and standardize them industrywide. The group is working to develop and promote a standard data format that can be used across all platforms (Revit, Tekla, Bentley, etc.) so that data can be transferred and read across all model authoring and audit software programs. The walls of proprietary software will be broken down by IFC. All models will soon be able to interact with each other in ways not possible before.

—Aleisha Jaeger, LEED AP, Operations Manager-Construction, Epstein

 

The rise of virtual reality

The integration of BIM with virtual reality technologies is a promising development. For example, use of augmented reality—where both graphical and contextual information are overlaid onto building systems in the real world to produce the effect of x-ray vision—will allow the operator to see the utilities installed in a wall cavity, ceiling space, and even underground. The possibility of cost savings using these applications is fascinating, and the execution and user experience are quite simple (e.g., Google Glass viewer or mobile device such as an iPad).

—Andre Zoldan, Chief Information Officer, Albert Kahn Associates

 

Other ideas offered by the group include:

• Use of early phase database programs, such as Trelligence’s Affinity, to do programming and planning in a database-rich environment that can be directly imported into BIM programs.

• Automating code compliance review with the BIM model. The International Code Council is leading and funding the buildingSMART initiative to develop SMARTcodes, which could allow teams to automate the entire code review process.

• Establishing central project control. Building models, along with the use of RFID, barcode technology, and GPS will soon facilitate “smart” job sites. For example, materials arriving on site will automatically be sensed and recorded by the model as delivered. No paperwork will be required.

Related Stories

| Feb 4, 2014

Must see: Student housing complex made with recycled shipping containers

Architect Christian Salvati's new structure is just the first step in bringing shipping container construction to New Haven, Conn.

| Feb 3, 2014

Gehry wins bid to design Berlin's tallest tower [slideshow]

The architect's "rotating cubes" scheme for the 300-unit residential tower beat out design submissions by eight other prominent firms, including Adjaye Associates and David Chipperfield Architects.

| Jan 31, 2014

Trump Hotel Collections announces luxury hotel for Rio de Janeiro

The 13-story, 171-guestroom Trump Rio will be Trump Hotel Collection’s first property in South America and the only luxury hotel in the neighborhood when it opens in 2016.

| Jan 31, 2014

LEGO, Google partner to develop 3D modeling tool for LEGO structures

The free tool, called Build, allows Chrome users to create virtual 3D structures using any shape and color in the LEGO catalog. 

| Jan 31, 2014

Ultra-modern McDonald's restaurant voted one of world's best new buildings

This McDonald's, which is combined with a fuel station and recreation areas, was awarded the Best Commercial Building of the Year by architecture website ArchDaily.

| Jan 31, 2014

6 considerations for rehabbing student union buildings

Most colleges and universities feel pressure to offer the latest amenities in order to attract and retain the best and brightest students. While hauling in the bulldozer to create modern facilities is attractive in some regards, deciding to renovate can be just as effective and, in some cases, even preferable to new construction.

| Jan 30, 2014

Mayors of 10 metros unite to cut building-related climate pollution

Organizers say combined initiative could cut as much climate-change pollution as generated by 1 million cars every year, and lower energy bills by nearly $1 billion annually.

| Jan 30, 2014

See how architects at NBBJ are using computational design to calculate the best views on projects [video]

In an ideal world, every office employee would have a beautiful view from his or her desk. While no one can make that happen in real life, computational design can help architects maximize views from every angle.

| Jan 30, 2014

The evolving workplace: One designer's inspiration board

"Open office" has been a major buzzword for decades, and like any buzzword, some of the novelty has worn off. I don't believe we will abandon the open office, but I do think we need to focus on providing a dynamic mix of open and closed spaces.

| Jan 30, 2014

How reverse engineering nature can spur design innovation

It’s not enough to copy nature. Today’s designers need a deeper understanding of environmental nuance, from the biome in.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021