flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Billie Jean King National Tennis Center serving up three-phase expansion

Billie Jean King National Tennis Center serving up three-phase expansion

The project includes the construction of two new stadiums and a retractable roof over the existing Arthur Ashe Stadium. 


By BD+C Staff | February 26, 2014
Renderings courtesy Blackney Hayes Architects
Renderings courtesy Blackney Hayes Architects

The United States Tennis Association’s Billie Jean King National Tennis Center in Queens, N.Y., is in the midst of a three-phase renovation that includes the construction of two new stadiums, as well as installing a retractable roof over the existing Arthur Ashe Stadium. 

Phase one includes relocation of practice and tournament courts, plus construction of the $100 million roof, designed by Rossetti and built by Hunt Construction Group. 

Phase two will include construction of the 8,000-seat Grandstand Stadium and relocation of field courts to make room for a larger pedestrian and fan esplanade. 

The 15,000-seat Louis Armstrong Stadium will be built in the final phase, which will also include upgrades to the east entrance. As a result of the $550 million project, the National Tennis Center will be able to accommodate an extra 10,000 people each day of the 2018 US Open.

 

Related Stories

| Apr 12, 2013

Chicago rail conversion puts local twist on High Line strategy

Plans are moving forward to convert an unused, century-old Chicago rail artery to a 2.7 mile, 13 acre recreational facility and transit corridor.

| Apr 11, 2013

AIA selects recipients of its 2013 Small Project Awards

The American Institute of Architects (AIA) has selected the ten recipients of the 2013 Small Project Awards. The AIA Small Project Awards Program, now in its tenth year, was established to recognize small-project practitioners for the high quality of their work and to promote excellence in small-project design.

| Apr 11, 2013

Hal Henderson Appointed to HGA Board of Directors

HGA Architects and Engineers (HGA) has appointed Hal Henderson, AIA, to its Board of Directors for 2013. Henderson is vice president and director of the firm’s Rochester office.

| Apr 11, 2013

George W. Bush Presidential Center achieves LEED Platinum certification

The George W. Bush Presidential Center announced today it has earned Platinum certification by the U.S. Green Building Council’s Leadership in Energy and Environmental Design program. The Bush Center is the first presidential library to achieve LEED Platinum certification under New Construction.

| Apr 11, 2013

American Folk Art Museum, opened in 2001, to be demolished

Just 12 years old, the museum designed by Tod Williams and Billie Tsien will be taken down to make way for MoMA expansion.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021