flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Bill & Melinda Gates Center for Computer Science & Engineering opens on the University of Washington campus

University Buildings

The Bill & Melinda Gates Center for Computer Science & Engineering opens on the University of Washington campus

LMN Architects designed the facility.


By David Malone, Associate Editor | March 26, 2019
Bill and Melinda Computer Science building exterior

All Photos: Tim Griffith

Since 2003, the University of Washington’s Paul G. Allen School of Computer Science and Engineering has grown considerably. The program outgrew the existing 165,000 sf building and found itself needing more space.

Enter the Bill & Melinda Gates Center for Computer Science & Engineering. Designed by LMN Architects, the 140,000-sf facility expands the current capacity of the school and provides research spaces, classrooms and lecture spaces, faculty offices, and a new home for the School’s undergraduate majors. A central, naturally-lit atrium provides visual and physical connections to all the floors and acts as the school’s central hub. At the roof-level, an event center will support a wide range of educational needs, industry collaborations, and outreach functions. A cafe activates the primary entry and acts as a transition between the exterior landscape to the central atrium.

 

Interior of the Bill and Melinda Gates Center for Computer Science and Engineering

 

The building’s exterior features a two-sided curving form that responds to the site’s topography and the flow of campus circulation. The building’s facade system of terra cotta panels in four texture types acts as a juxtaposition against the modern black glass and metal.

 

See Also: University of Arizona Student Success District begins construction

 

The completed project is targeting LEED New Construction Silver.

Related Stories

University Buildings | Mar 17, 2021

UIC’s Computer Design Center will help meet the demands of a growing student body

LMN Architects in collaboration with Booth Hansen is designing the project.

University Buildings | Feb 26, 2021

Dartmouth College’s new faculty and graduate student center completes

Leers Weinzapfel Associates designed the project.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Multifamily Housing | Jan 8, 2021

Student housing development in the time of COVID-19

Despite the coronavirus pandemic, many college and university residences were completed in time for classes, live or virtual. Here are 14 of the best.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

University Buildings | Dec 13, 2020

U. of Oregon’s new Knight Campus is set up to turn ideas into reality

Its design encourages occupant productivity and well-being.

Giants 400 | Dec 3, 2020

2020 Science & Technology Facilities Giants: Top architecture, engineering, and construction firms in the S+T sector

HDR, Jacobs, and Turner head BD+C's rankings of the nation's largest science and technology (S+T) facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021