flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BIG unveils new ESET Campus in Bratislava, Slovakia

Headquarters

BIG unveils new ESET Campus in Bratislava, Slovakia

The project will create an electricity-powered cybersecurity, AI, and innovation ecosystem.


By David Malone, Managing Editor | November 29, 2021
ESET Campus aerial
Renderings courtesy BIG and BLOOM

Bjarke Ingels Group has recently unveiled the design for the new ESET Campus. Located in Patronka, Bratislava, the 592,000-sf campus replaces a former military hospital between the Carpathian Mountains.

The campus comprises 12 individual buildings of varying sizes and uses organized around a central courtyard. The buildings on the outer perimeter will be designated public spaces, while four buildings on the inside of the site, each with their own central atrium, will be home to ESETā€™s 1,500 employees, with the potential to scale up to 2,400. The peak of the architectural ā€œmountainā€ is reminiscent of the nearby Carpathian Mountains and houses the ESET business.

ESET HQ campus

The main courtyard, located at the center of the four ESET HQ buildings, acts as a focal point for the local community. Public spaces serving retail, educational, sports, and cultural purposes are scattered around the courtyard, animating the ground floor and activating the network of streets. The overall massing of the campus has multiple frontages; the open corners of the four ESET HQ blocks, in combination with views into each building from the surrounding streets, create inviting moments that further connect the exterior with the interior.Ā 

On the northwest side, the campus opens up to the park. Embedded into the existing natural landscape, the park is filled with public areas for recreation, interaction, and relaxation while boosting local biodiversity and creating pockets suitable for outdoor working.

ESET Campus street view

Located in the largest building of the campus is the main ESET HQ lobby. A cascading staircase greets visitors and connects the ground floor with the upper levels. The stairs are surrounded with social spaces and biophilia, enhancing the connection of the active ground level to the upper office levels.

ESET Campus in the snow

All-electric energy, with an emphasis on renewable sources, will power the campus and contribute to the carbon-negative goal. The buildingsā€™ exteriors will utilize timber and glass to create a high-performance facade system and balconies will provide additional outdoor spaces and shading while also providing natural ventilation to maximize energy efficiency.

In addition to BIG, the design team include Inflow, Pantograph, BuroHappold, and ARUP. The project is slated to break ground in 2024 with a completion date of 2027.

ESEt campus courtyard

Related Stories

Headquarters | Jan 3, 2022

SOMā€™s ā€˜breathingā€™ building opens in Shenzhen

SOM designed the building for Shenzhen Rural Commercial Bank.

Headquarters | Nov 4, 2021

Pumaā€™s new North American HQ completes

Gensler designed the project.

Headquarters | Oct 28, 2021

Floridaā€™s Seagate Development Group tackles design-build projects from a developerā€™s vantage

A ā€œsingle point of contactā€ for clients, says its CEO.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Ā