flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BIG unveils design for the new OPPO R&D Headquarters in Hangzhou’s Future Sci-Tech City

Mixed-Use

BIG unveils design for the new OPPO R&D Headquarters in Hangzhou’s Future Sci-Tech City

The project sits between a natural lake, an urban center, and a 10,000-sm park.


By David Malone, Associate Editor | April 19, 2021
OPPO R&D Headquarters exterior

All renderings courtesy Bjarke Ingels Group

OPPO, China’s largest smartphone company, will soon have a new headquarters space courtesy of Bjarke Ingels Group. The new OPPO R&D Headquarters will be located in the heart of Yuhang District, Hangzhou, between a natural lake, an urban center, and a 10,000-sm park. The OPPO R&D Headquarters tower, also known as O-Tower, will include 1.7 million sf of office space and 732,000 sf of retail space. It will act as a new landmark and gateway to the Future Sci-Tech City and Hangzhou itself.

O-Tower’s design translates a traditional office slab with the perfect depth for access to daylight into a cylindrical courtyard building that is compact but also provides large, contiguous floor area. The southern edge of the building will be pushed down to the ground to minimize the external surge area of the more solar exposed facade while maximizing views out from the inward facade, which is self-shaded from solar gain by the geometry of the tower. The facade will be wrapped with adaptive facade louvers that are oriented according to sun angles and building geometry to reduce solar gain by up to 52%.

 

OPPO R&D Headquarters exterior ground level

 

A series of triple-height void spaces and interconnected terraces under the sloping O roof will provide casual and physical connectivity between floors as well as biophilic social spaces and shortcuts for all OPPO staff.

A publicly accessible courtyard will rest at the heart of O-Tower and become an urban living room for the city. The courtyard will transition from a mineral hardscape at the center into a lush, green landscape as it extends out toward the waterfront. The space will provide fresh air, retain water, and support a biodiverse public realm that connects to the daily life of the city.

 

OPPO R&D Headquarters interior glazing

 

The ground floor will be open with an interconnected public space that leads visitors and staff through lobbies, exhibition spaces, or out to the park. The first three floors will be reserved for public programming and include exhibition space, conference centers, a canteen, and an incubator for external workshops. On the upper floors, a dedicated OPPO canteen as well as executive and VIP lounges will overlook Hangzhou’s wetlands alongside the triple-height interconnected atria under the O-ring facade. All of the building’s floors will integrate workspaces with biophilia and social spaces.

 

OPPO R&D Headquarters  illuminated at dusk

 

Flexible floor plates will range from spacious and large floors suitable for R&D departments and social projects to smaller, more traditional floors for administration and executive functions.

The design for the O-Tower has been developed by BIG in collaboration with ZIAD (Local Design Institute), Co-Create Golden Technique Project Management (Client Project Managers), RBS (Structural Engineers), RFR (Façade Consultants), WSP (Traffic, MEP, VT Consultant), BPI (Lighting designer), Savills (Programming consultant), TFP (Foodservice planner), and UAD (Traffic evaluation agency).

 

OPPO R&D Headquarters courtyard space looking up

 

OPPO R&D Headquarters interior space

 

OPPO R&D Headquarters interior circulation space

 

OPPO R&D Headquarters aerial

 

OPPO R&D Headquarters exterior lobby

Tags

Related Stories

Mixed-Use | Aug 9, 2017

Mixed-use development will act as a gateway to Orange County’s ‘Little Saigon’

The development will include apartments, ground-floor retail, and a five-story hotel.

Mixed-Use | Aug 8, 2017

Dorte Mandrup’s 74,000-sm masterplan will be highlighted by an IKEA and BIG’s ‘Cacti’

The mixed-use development links a new IKEA store, a hotel, and housing with green space.

Mixed-Use | Aug 3, 2017

A sustainable mixed-use development springs from a Dutch city center like a green-fringed crystal formation

MVRDV and SDK Vastgoed won a competition to redevelop the inner city area around Deken van Someren Street in Eindhoven.

Mixed-Use | Aug 2, 2017

Redevelopment of Newark’s Bears Stadium site receives team of architects

Lotus Equity Group selected Michael Green Architecture, TEN Aquitectos, Practice for Architecture and Urbanism, and Minno & Wasko Architects and Planners to work on the project.

Retail Centers | Jul 20, 2017

L.A.’s Promenade at Howard Hughes Center receives a new name and a $30 million cash injection

Laurus Corporation and The Jerde Partnership will team up to rebrand the center as a family-friendly dining and entertainment destination.

Office Buildings | Jul 12, 2017

CetraRuddy unveils seven-story office building design for Staten Island’s Corporate Park

Corporate Commons Three is expected to break ground later this summer.

Mixed-Use | Jul 7, 2017

ZHA’s Mandarin Oriental hotel and residences employs ‘stacked vases’ design approach

The mixed-use tower will rise 185 meters and be located in Melbourne's Central Business District.

Office Buildings | Jun 27, 2017

Bloomberg’s European headquarters wants to become a natural extension of London

Foster + Partners’ design rises 10 stories and is composed of two connected buildings.

Multifamily Housing | May 25, 2017

Luxury residential tower is newest planned addition to The Star in Frisco

The building will be within walking distance to the Dallas Cowboys World Headquarters.

Mixed-Use | May 24, 2017

Schmidt Hammer Lassen Architects will develop mixed-use project on former site of Carlsberg Brewery

The 36,000-sm project will cover a city block and include a residential tower.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021