flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Big changes coming to Ontario building code

Codes and Standards

Big changes coming to Ontario building code

Proposals include solar-ready roofs, more stringent heating/cooling efficiency requirements, and graywater reuse.


By Peter Fabris, Contributing Editor | August 16, 2017
The Ontario skyline at night

Pixabay Public Domain

Changes to the Province of Ontario’s building code could include requirements for solar-ready roofs, more stringent heating/cooling efficiency requirements, and graywater reuse.

Ontario’s code is scheduled to be replaced as of Jan. 1, 2019. New requirements will support the government’s Climate Change Action Plan unveiled in June 2016. The plan aims to reduce GHG emissions and implement energy-efficient measures in new homes and large buildings.

To be considered solar-ready, large building roofs will have to be able to support a larger dead load allowing for the weight of a future installation of a PV or solar hot water system. In addition conduits will have to be installed on all new houses and buildings. Another proposal is for all apartment buildings and condominiums to have a heat or energy recovery unit as part of their ventilation system.

The Ministry of Municipal Affairs is seeking comments to be posted on their site during the 77-day comment period that closes September 29, 2017.

Related Stories

Codes and Standards | Jan 3, 2022

Biden’s executive order for a carbon-neutral government includes green materials mandate

As a driver of demand, federal procurement impact could ripple through the economy.

Codes and Standards | Jan 3, 2022

Controversial California solar power incentive proposal would reduce subsidies

Plan intended to encourage customers to install power storage systems.

Codes and Standards | Jan 3, 2022

New York City bans new gas hookups

Applies to gas stoves, boilers, and heaters in new buildings and buildings that undergo gut renovations.

Codes and Standards | Jan 3, 2022

New engineering guide on fire safety for very tall buildings released

Topics include emergency egress, fire resistance, building envelope, suppression, detection, alarms, and smoke control.

Codes and Standards | Dec 22, 2021

Updated ASCE 7-22 standard includes first-ever criteria for tornado-resistant design

New document provides up-to-date, coordinated loading provisions for general structural design.

Codes and Standards | Dec 21, 2021

Outdated and redundant building codes plague St. Louis area development

Region’s combined codes nearly double the length of the IRS Code.

Digital Twin | Dec 20, 2021

Groups ally to advance augmented reality and digital twin technology

AREA and Digital Twin Consortium to work on improving how technology components interoperate.

Codes and Standards | Dec 20, 2021

Tension rises in California over state’s push to build more housing

Attorney general hints at lawsuits against cities that don’t comply with zoning reform.

Codes and Standards | Dec 17, 2021

Tension rises in California over state’s push to build more housing

Attorney general hints at lawsuits against cities that don’t comply with zoning reform.

Codes and Standards | Dec 16, 2021

Home builders defeat proposed Oklahoma energy conservation code upgrade

Builders cite high home prices for opposition.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021