flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Big changes coming to Ontario building code

Codes and Standards

Big changes coming to Ontario building code

Proposals include solar-ready roofs, more stringent heating/cooling efficiency requirements, and graywater reuse.


By Peter Fabris, Contributing Editor | August 16, 2017
The Ontario skyline at night

Pixabay Public Domain

Changes to the Province of Ontario’s building code could include requirements for solar-ready roofs, more stringent heating/cooling efficiency requirements, and graywater reuse.

Ontario’s code is scheduled to be replaced as of Jan. 1, 2019. New requirements will support the government’s Climate Change Action Plan unveiled in June 2016. The plan aims to reduce GHG emissions and implement energy-efficient measures in new homes and large buildings.

To be considered solar-ready, large building roofs will have to be able to support a larger dead load allowing for the weight of a future installation of a PV or solar hot water system. In addition conduits will have to be installed on all new houses and buildings. Another proposal is for all apartment buildings and condominiums to have a heat or energy recovery unit as part of their ventilation system.

The Ministry of Municipal Affairs is seeking comments to be posted on their site during the 77-day comment period that closes September 29, 2017.

Related Stories

| Feb 9, 2012

Initiative to sell off under-used federal property gaining momentum

The bill is similar to a White House planto cut $8 billion worth of building costs by the end of the 2012 fiscal year, and to establish a panel to identify other sites worth selling or donating to nonprofits or state and local governments.

| Feb 9, 2012

Computer tool helps engineers design roof cladding using Canada's building code

Easier to design roof cladding that can withstand winds in a given area. 

| Feb 9, 2012

Webinar focuses on lessons learned from LEED-certified industrial project

This case study will focus on strategies used to save the client money, achieve certification, and effectively market success once the project was complete.

| Feb 9, 2012

Rapid growth of zero energy buildings expected

Much of that growth will be in the European Union, where near-zero energy buildings are mandated by 2019 for public buildings, and by 2021 for all construction.

| Feb 9, 2012

Stiffer OSHA fines put strain on Kansas contractors

A fine for a violation that once cost between $750 and $1,200 now runs $7,000 or more per incident, according to a state industry association official.

| Feb 9, 2012

Webinar focuses on lessons learned from LEED-certified industrial project

A Construction Specifications Institute webinar will focus on the lessons learned through the design and construction of a LEED-certified industrial project, Better Living Mill Shop, the first industrial building in Central Virginia to earn LEED certification.

| Feb 8, 2012

California likely to eliminate redevelopment agencies

Leaders of California cities had been trying to fashion a compromise with lawmakers after the state Supreme Court ruled the state had the authority to eliminate the agencies and use their property tax money for local services.

| Feb 8, 2012

Project aimed at economical seismic retrofits on historic Memphis structures

The group will develop a low-cost seismic retrofit model that would benefit aging brick-and-mortar structures. It involves bolting steel brackets to existing wooden floor and ceiling joists.

| Feb 8, 2012

Houston signs on to Better Buildings Challenge

The challenge has about $4 billion in federal and private-sector funds, which it will use for building energy upgrades nationwide in the next two years.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021