flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Big changes coming to Ontario building code

Codes and Standards

Big changes coming to Ontario building code

Proposals include solar-ready roofs, more stringent heating/cooling efficiency requirements, and graywater reuse.


By Peter Fabris, Contributing Editor | August 16, 2017
The Ontario skyline at night

Pixabay Public Domain

Changes to the Province of Ontario’s building code could include requirements for solar-ready roofs, more stringent heating/cooling efficiency requirements, and graywater reuse.

Ontario’s code is scheduled to be replaced as of Jan. 1, 2019. New requirements will support the government’s Climate Change Action Plan unveiled in June 2016. The plan aims to reduce GHG emissions and implement energy-efficient measures in new homes and large buildings.

To be considered solar-ready, large building roofs will have to be able to support a larger dead load allowing for the weight of a future installation of a PV or solar hot water system. In addition conduits will have to be installed on all new houses and buildings. Another proposal is for all apartment buildings and condominiums to have a heat or energy recovery unit as part of their ventilation system.

The Ministry of Municipal Affairs is seeking comments to be posted on their site during the 77-day comment period that closes September 29, 2017.

Related Stories

| Sep 14, 2012

NRCA University offers photovoltaic class

NRCA University will offer a class called “Photovoltaic Roof Systems: Energizing Your Business” Oct. 16 in Philadelphia.

| Sep 14, 2012

Costa Rica’s strict building codes prevent major damage in powerful quake

The relatively little damage from a 7.6 earthquake was due in large part to strict building codes in Costa Rica, a country that has long enjoyed more stability, better governance, and stronger economic development than many of its Central American neighbors.

| Sep 14, 2012

Building codes should require continuous connection from roof to foundation, says IBHS chief

“One of the most effective ways to greatly increase a building’s strength and safety during hurricanes, tornadoes and straight-line windstorms is to be sure the building is tied together properly,” says Julie Rochman, president and CEO of the Insurance Institute for Business & Home Safety (IBHS).

| Sep 7, 2012

Related Companies and unions agree to wage-cutting deal on Hudson Yards

The Related Companies has won wage-cutting agreements with four dozen construction unions in its efforts to save money on the $15 billion development of Hudson Yards.

| Sep 7, 2012

Lorain, Ohio considers halting downtown construction while it works out development plan

Construction would stop downtown for six months while Lorain, Ohio officials consider a development plan for the city, according to new legislation.

| Sep 7, 2012

Business, labor groups push for easing of California’s Environmental Quality Act

Business and labor groups have combined forces to push for a change to California's Environmental Quality Act, specifically its complex review process for building and construction projects.

| Sep 7, 2012

Twenty years later, Florida contractors cite Hurricane Andrew as construction game-changer

Remarking on the 20th anniversary of Hurricane Andrew, which devastated south Florida; contractors are noting the storm’s impact on their industry—including the state’s adoption of tougher building codes.

| Sep 7, 2012

At risk for nine types of natural disasters, Texas trails most coastal states on building codes

Texas has the most diverse weather risk in the country, with exposure to nine different types of natural disasters.

| Aug 30, 2012

OSHA plans new crane-safety standards for demolition and underground work

The new rule will streamline OSHA’s standards by eliminating the separate cranes and derricks standard currently used for underground and demolition work.

| Aug 30, 2012

Federal government cancels defense contracts worth $2.15 billion

This action may foreshadow federal spending cuts scheduled for year's end if Congress takes no action on the federal budget.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021