A national research study conducted by Eric Mower + Associates' Contractor Insight specialty reveals that contractors make nearly half of their tool and building supply purchases from big-box retailers.
"Retailers score high for variety and convenience, but that's not the whole story for brand marketers; they must 'see' the customer as a shopper, not only as a contractor. If they don't— and they don't know the shopper's journey or how to align their product in the retail environment— they will not reach full potential in the aisles," said John O'Hara partner and leader of EMA's Contractor Insight specialty.
When it comes to purchasing hand tools, power tools and tool accessories, big-box retailers like Home Depot and Lowe's have an advantage over traditional distributors as the preferred shopping destination. Study respondents cited convenience, range of products and brands, and accessibility as their reasons for choosing their place of purchase.
According to the research, 46% of contractors purchase hand tools, 47% purchase power tools and 49% purchase accessories from big-box retailers; 42%, 35% and 36% purchase hand tools, power tools and accessories from distributors, respectively.
Contractors perceived big-box retailers to have a better variety of products, lower pricing, and greater convenience as a one-stop shop, according to the study. Of the respondents, 63% would prefer to make small-volume purchases at big box retailers.
Those who prefer purchasing through distributors said it was for their customer service (75%), relationships (70%), knowledge (63%) and delivery (54%), all of which ranked significantly higher when compared to retailers. Distributors were also ranked high for having tools for pros, shipping directly to the contractor site and credit arrangements. According to the survey, 80% would make large-volume purchases at the distributorship, especially for plumbers (91%).
The EMA study was administered online to 500 general contractors, electricians, plumbers and HVAC specialists. More than 90 percent of respondents have at least six years' professional experience. BD+C
Related Stories
| Sep 30, 2014
The Big Room concept: Using Building Team collocation to ensure project success
Implementing collocation via the Big Room concept will remove silos, ensure a cadence for daily communication, promote collaboration, and elevate your chances for success, write CBRE Healthcare's Stephen Powell and Magnus Nilsson.
| Sep 30, 2014
USGBC, Bank of America name recipients of 2014 Affordable Green Neighborhoods Grant Program
Eleven projects have been selected for the 2014 Affordable Green Neighborhoods grant program. Each will receive $31,000 and an educational package to support their pursuit of LEED for Neighborhood Development certification.
Sponsored | | Sep 30, 2014
What are you doing to win business and improve morale?? VDC Director Kris Lengieza shares ways to do both
Bluebeam's Sasha Reed sits down with Kris Lengieza, Director of Virtual Design and Construction for Stiles Corporation, to learn how he approaches change management. SPONSORED CONTENT
Sponsored | | Sep 30, 2014
How project managers can manage technology
Not long ago, the role of a construction project manager revolved around working with people: employees, vendors, consultants, designers, subcontractors and owners. Today, project managers primarily manage information. SPONSORED CONTENT
| Sep 30, 2014
With its 'stacked volumes' scheme, 3XN wins bid to design high-rise in Sydney
By dividing the 200-meter building into five separate volumes and placing atria throughout each volume, the spaces become smaller, more intimate social environments, according to the Danish architects.
| Sep 29, 2014
Living Building vs. LEED Platinum: Comparing the first costs and savings
Skanska USA's Steve Clem breaks down the costs and benefits of various ultra-green building standards and practices.
| Sep 29, 2014
10 common deficiencies in aging healthcare facilities
VOA's Douglas King pinpoints the top issues that arise during healthcare facilities assessments, including missing fire/smoke dampers, out-of-place fire alarms, and poorly constructed doorways.
| Sep 29, 2014
Snøhetta releases final plan for terraced central library in Calgary
The competition-winning New Central Library is now in the final design stages, after two years of community engagement on the part of design firms Snøhetta and DIALOG.
| Sep 25, 2014
Jean Nouvel unveils plans for National Art Museum of China
Of the design, Nouvel describes it as inspired by the simplicity of “a single brush stroke.”
Sponsored | | Sep 25, 2014
Your business doesn’t always need to change
By now, the idea that organizations must adapt to maintain both relevance and market share is so ingrained that it’s been reduced to pithy sayings. But is constant adaptation always the best policy? SPONSORED CONTENT