Bernards, a nationally ranked commercial builder with five offices throughout the southwest, is collaborating with SWA Architects as the Design Builder for a new medical office building on the White Memorial Medical Center (WMMC) campus in Los Angeles.
The new facility is a $15-million, 41,000-sf concrete structure which includes three stories of medical office space atop a three-level parking garage. The interior will incorporate the same colors and textures used throughout other campus buildings. Bernards broke ground on this facility earlier this year and completion is scheduled for September 2013.
Bernards previously served as general contractor for a new $18-million, 19,333-square-foot concourse building at White Memorial Medical Center. This project, which was completed in 2010, included the hospital’s main entry, pergola, meditation garden, lobby, chapel, gift shop and waiting areas, as well as a porte cochere (covered vehicle entryway) and an underground tunnel connecting the concourse building with the specialty care tower, north and south buildings. +
Related Stories
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.