Bernards, a commercial builder with five offices throughout the southwest, has been selected by the Merced Union High School District to build El Capitan High School in Merced, announced Steve Pellegren, vice president of preconstruction services for Bernards.
Designed by San Jose, Calif.-based BCA Architects, the $76 million, 220,000-ft project encompasses nine buildings, including an administration building, library, new classrooms for the English and language arts, math, science, agriculture and special education departments and science and IT laboratory facilities, agricultural, metal and auto shop, as well as a full-service cafeteria and full theater that includes an open assembly hall with band and orchestra areas.
The project also involves developing new athletic fields, including a grass football field, crushed-clay track, competition baseball and softball fields and bleachers, and gymnasium, which will house a main gym, locker rooms, practice gym, wrestling room and coaches’ offices.
Bernards broke ground in June 2011 on the phased project, which is scheduled for completion in June 2013. The project involves extensive site work to grade the 58-acre site where the school will be situated and connect campus infrastructure to existing city streets and underground utilities. This will include relocating utilities, paving road and sidewalks, and installing traffic signals, fencing and landscaping. +
Related Stories
| Jul 11, 2012
HOK honored with Los Angeles architectural award
42nd annual awards from the Los Angeles Business Council honor design excellence.
| Jul 11, 2012
Skanska relocates its Philadelphia metro office
Construction firm’s new 19,100-sf office targets LEED Gold certification.
| Jul 9, 2012
Modular Construction Delivers Model for New York Housing in Record Time
A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.
| Jul 9, 2012
Integrated Design Group completes UCSB data center
Firm uses European standard of power at USCB North Hall Research Data Center.
| Jul 9, 2012
Oakdale, Calif., Heritage Oaks Senior Apartments opens
New complex highlights senior preferences for amenities.
| Jul 3, 2012
Trimble to acquire WinEstimator
Acquisition adds estimating software solutions to Meridian Systems’ portfolio.
| Jul 3, 2012
Summit Design+Build completes Emmi Solutions HQ
The new headquarters totals 20,455 sq. ft. and features a loft-style space with exposed masonry and mechanical systems, 17-ft clear ceilings, two large rooftop skylights, and private offices with full glass partition walls.
| Jul 3, 2012
TOLK now called Dewberry
The renaming indicates a simplification in Dewberry’s corporate naming conventions.
| Jul 2, 2012
Bernards building mixed-use project in Beverly Hills
The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.
| Jul 2, 2012
San Francisco lays claim to the greenest building in North America
The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.