flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Bernards building mixed-use project in Beverly Hills

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.


By Posted by Tim Gregorski, Senior Editor | July 2, 2012
Designed by McLarand Vasquez Emsiek & Partners, Inc., the eight-story buildings
Designed by McLarand Vasquez Emsiek & Partners, Inc., the eight-story buildings design includes floor-to-ceiling glass, curved

Bernards is currently constructing 8500 Burton Way, a $32 million residential mixed-use project at the intersection of Burton Way and La Cienega Blvd. in West Los Angeles.  

Being developed by Caruso Affiliated, the project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

Designed by McLarand Vasquez Emsiek & Partners, Inc., the eight-story building’s design includes floor-to-ceiling glass, curved lines, pronounced deck-edge elements, and an smooth-plaster and stone façade.

The residential component provides one- and two-bedroom apartment suites that range in size from 900 to 2,200-sf. They feature high ceilings, separate media rooms, wall-to-wall, floor-to-ceiling windows, and balconies or patios that provide views to downtown, the Hollywood Hills, and Pacific Ocean.

Related Stories

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021