flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Bernards building mixed-use project in Beverly Hills

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.


By Posted by Tim Gregorski, Senior Editor | July 2, 2012
Designed by McLarand Vasquez Emsiek & Partners, Inc., the eight-story buildings
Designed by McLarand Vasquez Emsiek & Partners, Inc., the eight-story buildings design includes floor-to-ceiling glass, curved

Bernards is currently constructing 8500 Burton Way, a $32 million residential mixed-use project at the intersection of Burton Way and La Cienega Blvd. in West Los Angeles.  

Being developed by Caruso Affiliated, the project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

Designed by McLarand Vasquez Emsiek & Partners, Inc., the eight-story building’s design includes floor-to-ceiling glass, curved lines, pronounced deck-edge elements, and an smooth-plaster and stone façade.

The residential component provides one- and two-bedroom apartment suites that range in size from 900 to 2,200-sf. They feature high ceilings, separate media rooms, wall-to-wall, floor-to-ceiling windows, and balconies or patios that provide views to downtown, the Hollywood Hills, and Pacific Ocean.

Related Stories

| Mar 7, 2012

LEO A DALY opens new office in Riyadh, Saudi Arabia

Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.

| Mar 7, 2012

Turner appointed Batson-Cook CFO and treasurer

Cecil G. Hood to continue in advisory role.

| Mar 7, 2012

Thornton Tomasetti names Dowdall VP of Kansas City office

Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.

| Mar 7, 2012

LEO A DALY selected to design Minnesota Fallen Firefighters Memorial

The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.

| Mar 7, 2012

Houlihan Lokey adds Steffen to Industrials Group

Steffen bolsters group with experience in the building materials and rorest product sectors.

| Mar 6, 2012

Country’s first Green House home for veterans completed

Residences at VA Danville to provide community-centered housing for military veterans.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 6, 2012

BLT Architects promotes two to associate

Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.

| Mar 6, 2012

Joliet Junior College achieves LEED Gold

With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021