flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Berkeley Lab opens 'world's most comprehensive building efficiency simulator'

Berkeley Lab opens 'world's most comprehensive building efficiency simulator'

DOE’s new FLEXLAB is a first-of-its-kind simulator that lets users test energy-efficient building systems individually or as an integrated system, under real-world conditions.


By BD+C Staff | July 10, 2014
Images courtesy of FLEXLAB
Images courtesy of FLEXLAB

Innovation is brewing in the Bay Area, and it’s not coming from another app development. FLEXLAB, a laboratory dedicated to studying energy efficiency, just opened up at the Lawrence Berkeley National Laboratory in the hills above UC Berkeley.

The lab is supported by the U.S. Department of Energy, and as of now, it is the only one of it’s kind in the world.

“It’s the first that tests system level technologies,” says Cynthia Regnier, FLEXLAB’s executive manager. “[FLEXLAB] provides a platform upon which we could test these systems and revalidate performance and improve it before it gets committed and built in the order of hundreds of thousands of square footage and millions of dollars of investment.”

According to local newspaper Contra Costa Times, startups, architects, designers, utilities and manufacturers in the Silicon Valley are invited to use FLEXLAB for fees adjusted to specific needs.

There are four separate labs to test-drive different technologies: Heating, ventilation and air-conditioning systems, lighting, windows and the building envelope.

Find out more at FLEXLAB’s official website.

 

Related Stories

| Nov 29, 2011

Turner Construction establishes partnership with Clark Builders

Partnership advances growth in the Canadian marketplace.

| Nov 29, 2011

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 28, 2011

Armstrong acquires Simplex Ceilings

Simplex will become part of the Armstrong Building Products division.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 23, 2011

Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas

Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.

| Nov 23, 2011

Griffin Electric completes Gwinnett Tech project

Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

| Nov 22, 2011

Report finds that L.A. lags on solar energy, offers policy solutions

Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.

| Nov 22, 2011

Saskatchewan's $1.24 billion carbon-capture project

The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021