flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Benefits of building enclosure commissioning include reduced costs

Codes and Standards

Benefits of building enclosure commissioning include reduced costs

Savings achieved in less rework and fewer and shorter punch lists.


By Peter Fabris, Contributing Editor | September 24, 2020

Courtesy Pixabay

Building enclosure commissioning, a quality-assurance process intended to ensure a building meets the owner’s requirements, offers benefits including cost savings. The process fosters the ability to catch and eliminate problems early and inexpensively, resulting in reduced project costs and fewer change orders.

ASHRAE Guideline 0-2013 and NIBS Guideline 3 both address building enclosure commissioning. The process begins in the predesign phase with the formation of a commissioning team.

The key document established by the commissioning team in the predesign phase is the owner’s project requirements, which means the owner’s representatives are an invaluable part of the commissioning team for making the owner’s needs known and understood.

After design and construction, the commissioning process should address ongoing operation, maintenance and modification of the project throughout its life. Commissioning guidelines also cover responsibilities for the team and commissioning authority, expectations for the schedule, and documentation. Other practices found within the guidelines include documenting training requirements, verifying training, and the creation of a systems manual for understanding how to operate and maintain all the systems and assemblies within a project.

Related Stories

Codes and Standards | Mar 4, 2021

Biden administration overturns Trump’s federal building design mandate

Previous order promoted classical and “traditional” architecture above others.

Codes and Standards | Mar 3, 2021

Texas freeze raises questions about risks of electrifying buildings

Gas stoves helped residents cook, boil water when power went out.

Codes and Standards | Mar 2, 2021

New Seattle building code eliminates fossil fuels for most space and water heating

Also increases on-site solar photovoltaics, reduces envelope heat loss, air leakage, and interior lighting power allowances.

Codes and Standards | Feb 25, 2021

It’s not just lumber—roofing material prices are also on the rise

Lower demand for petroleum products means less asphalt production.

Codes and Standards | Feb 23, 2021

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.

Codes and Standards | Feb 22, 2021

Preservation of Affordable Housing develops climate resilience strategy

Includes backup power for resident and staff “area of refuge”.

Codes and Standards | Feb 18, 2021

Construction industry moves toward comprehensive U.S. BIM standard

NIBS hosts roundtable to create coordinated program to advance collaboration.

Codes and Standards | Feb 17, 2021

Construction on international sports venues is ripe for corruption

Poor planning, complex contracting, a lack of accountability and high levels of collusion to blame.

Codes and Standards | Feb 16, 2021

Feds may fund removal of some urban highways

Senate bill proposes pilot program to reknit communities.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021