flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Benefits of building enclosure commissioning include reduced costs

Codes and Standards

Benefits of building enclosure commissioning include reduced costs

Savings achieved in less rework and fewer and shorter punch lists.


By Peter Fabris, Contributing Editor | September 24, 2020

Courtesy Pixabay

Building enclosure commissioning, a quality-assurance process intended to ensure a building meets the owner’s requirements, offers benefits including cost savings. The process fosters the ability to catch and eliminate problems early and inexpensively, resulting in reduced project costs and fewer change orders.

ASHRAE Guideline 0-2013 and NIBS Guideline 3 both address building enclosure commissioning. The process begins in the predesign phase with the formation of a commissioning team.

The key document established by the commissioning team in the predesign phase is the owner’s project requirements, which means the owner’s representatives are an invaluable part of the commissioning team for making the owner’s needs known and understood.

After design and construction, the commissioning process should address ongoing operation, maintenance and modification of the project throughout its life. Commissioning guidelines also cover responsibilities for the team and commissioning authority, expectations for the schedule, and documentation. Other practices found within the guidelines include documenting training requirements, verifying training, and the creation of a systems manual for understanding how to operate and maintain all the systems and assemblies within a project.

Related Stories

Codes and Standards | Mar 23, 2017

New manual of IT connectivity guidelines for commercial developments, redevelopments released

Mobile capacity planning, conduit points of entry, and electrical resiliency are covered.

Codes and Standards | Mar 22, 2017

Brick Industry Assn. study finds brick buildings cost less than precast, metal, and glass

The study compares costs in five categories of construction.

Codes and Standards | Mar 21, 2017

Calif. shopping center is first to earn BREEAM USA In-Use certification

The certification measures and monitors environmental performance of existing buildings.

Codes and Standards | Mar 20, 2017

Professional liability insurance rates for architects and engineers expected to be stable in 2017

Premiums leveled off in 2015, and claims have been stable, helping to hold costs down.

Codes and Standards | Mar 15, 2017

Energy Star program at risk

The standard-setting initiative for energy-efficient products may be a victim of Trump budget cuts.

Codes and Standards | Mar 13, 2017

U.S. House and Senate have voted to repeal Dept. of Labor’s 'blacklisting' rule

The rule mandates labor compliance review for federal construction contractors.

Codes and Standards | Mar 9, 2017

WiredScore forms Connectivity Advisory Committee

The committee's creation is an important step forward for the group that evaluates internet connectivity in buildings.

Codes and Standards | Mar 8, 2017

New guide examines multifamily high-performance ventilation

The focus is on cost and performance of various systems.

Codes and Standards | Mar 7, 2017

Canada’s national building codes will encompass effects of climate change

Forecasted data, not historical data, will be used as the basis for the codes.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021