flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Benefits of building enclosure commissioning include reduced costs

Codes and Standards

Benefits of building enclosure commissioning include reduced costs

Savings achieved in less rework and fewer and shorter punch lists.


By Peter Fabris, Contributing Editor | September 24, 2020

Courtesy Pixabay

Building enclosure commissioning, a quality-assurance process intended to ensure a building meets the owner’s requirements, offers benefits including cost savings. The process fosters the ability to catch and eliminate problems early and inexpensively, resulting in reduced project costs and fewer change orders.

ASHRAE Guideline 0-2013 and NIBS Guideline 3 both address building enclosure commissioning. The process begins in the predesign phase with the formation of a commissioning team.

The key document established by the commissioning team in the predesign phase is the owner’s project requirements, which means the owner’s representatives are an invaluable part of the commissioning team for making the owner’s needs known and understood.

After design and construction, the commissioning process should address ongoing operation, maintenance and modification of the project throughout its life. Commissioning guidelines also cover responsibilities for the team and commissioning authority, expectations for the schedule, and documentation. Other practices found within the guidelines include documenting training requirements, verifying training, and the creation of a systems manual for understanding how to operate and maintain all the systems and assemblies within a project.

Related Stories

Codes and Standards | Oct 10, 2018

Interactive heat maps track temperature ranges in U.S. cities

Urban heat island effect can vary by as much as 37°F in the same city.

Codes and Standards | Oct 9, 2018

Power systems will become more decentralized for better disaster resiliency

Businesses, homeowners will control more power-generation capacity.

Codes and Standards | Oct 5, 2018

Getting commitments from key subs critical on government contracts

Withdrawn subcontractor bids can be costly.

Codes and Standards | Oct 4, 2018

Internal watchdog says EPA falling short to protect school children from asbestos

Agency not conducting enough inspections, report says.

Codes and Standards | Oct 3, 2018

Climate change impacts could prompt realignment of assets for commercial property developers

Strategies include reducing exposure to properties in flood-prone areas.

Codes and Standards | Oct 2, 2018

Political will, tougher standards needed to reach carbon neutral goal

Stretch codes, more stringent credentials for designers, contractors, and inspectors may be needed.

Codes and Standards | Sep 27, 2018

Natural light is the most prized office perk

Employees crave sunshine and views of the outdoors more than cafeterias, fitness centers, and childcare.

Codes and Standards | Sep 26, 2018

Industry consensus needed for multifamily energy efficiency retrofit approach

Choice of insulating materials can impact indoor air quality, resident health.

Codes and Standards | Sep 25, 2018

New market forces disrupting global real estate development industry

Executives concerned about trade policy, labor shortages, approval processes.

Codes and Standards | Sep 21, 2018

More than 130 organizations petition OSHA to create heat protection standard for workers

Includes mandatory rest breaks, heat-exposure monitoring, record-keeping injury requirement.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â