flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Believe it or not, there could be a shortage of office space in the years ahead

Office Buildings

Believe it or not, there could be a shortage of office space in the years ahead

Construction of Class A properties has slowed dramatically


By Peter Fabris, Contributing Editor | December 11, 2023
Believe it or not, there could be a shortage of office space in the years ahead - Image by StockSnap from Pixabay
Image by StockSnap from Pixabay

With work-from-home firmly established, many real estate analysts predict a dramatic reduction in office space leasing and plummeting property values.

But the high-end of the office segment might actually be headed for a shortage, according to real estate intelligence company CoStar Group. This counterintuitive trend is due to a drastic drop in construction of elite Class A properties.

Despite the overall drop in occupied office space, buildings aged 0-3 years are doing well. They have attracted an average of 12.7 million sf per quarter since the beginning of 2020. By comparison, the quarterly average from 2011-2019 for similar properties was 11.7 million sf.

Office construction has slowed dramatically this year. Less than 30 million sf has broken ground in 2023, making it the lowest year for construction starts since 2011. If this trend continues, the type of space most in demand—newly constructed units—will have the shortest supply.

Related Stories

Office Buildings | Jun 8, 2017

Take a look at the plans for Google’s new 1 million-sf London campus

Heatherwick Studio and BIG are designing the 11-story building.

Building Team Awards | Jun 6, 2017

Nerves of steel: 150 North Riverside

Platinum Award: It took guts for a developer and its Building Team to take on a site others had shunned for most of a century.

Office Buildings | Jun 2, 2017

Strong brew: Heineken HQ spurs innovation through interaction [slideshow]

The open plan concept features a Heineken bar and multiple social zones.

Office Buildings | May 30, 2017

How tech companies are rethinking the high-rise workplace

Eight fresh ideas for the high-rise of the future, from NBBJ Design Partner Jonathan Ward.

| May 24, 2017

Accelerate Live! talk: Applying machine learning to building design, Daniel Davis, WeWork

Daniel Davis offers a glimpse into the world at WeWork, and how his team is rethinking workplace design with the help of machine learning tools.

High-rise Construction | May 23, 2017

Goettsch Partners to design three-building Optics Valley Center complex

The Chicago-based firm won a design competition to design the complex located in Wuhan, China.

Office Buildings | Apr 18, 2017

Heineken USA Headquarters redesign emphasizes employee interaction

An open plan with social hubs maximizes co-working and engagement.

Office Buildings | Apr 17, 2017

Vertical integration triggers growth for an L.A.-based office furniture provider

Customization and technology drive sales for Tangram Interiors.

Market Data | Apr 13, 2017

2016’s top 10 states for commercial development

Three new states creep into the top 10 while first and second place remain unchanged.

Office Buildings | Apr 10, 2017

Innovation lab makes developing eye care solutions a collaborative affair

The Shop East innovation lab presents 13,500 sf of workspace across two floors with an emphasis on collaboration. 

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021