flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Believe it or not, there could be a shortage of office space in the years ahead

Office Buildings

Believe it or not, there could be a shortage of office space in the years ahead

Construction of Class A properties has slowed dramatically


By Peter Fabris, Contributing Editor | December 11, 2023
Believe it or not, there could be a shortage of office space in the years ahead - Image by StockSnap from Pixabay
Image by StockSnap from Pixabay

With work-from-home firmly established, many real estate analysts predict a dramatic reduction in office space leasing and plummeting property values.

But the high-end of the office segment might actually be headed for a shortage, according to real estate intelligence company CoStar Group. This counterintuitive trend is due to a drastic drop in construction of elite Class A properties.

Despite the overall drop in occupied office space, buildings aged 0-3 years are doing well. They have attracted an average of 12.7 million sf per quarter since the beginning of 2020. By comparison, the quarterly average from 2011-2019 for similar properties was 11.7 million sf.

Office construction has slowed dramatically this year. Less than 30 million sf has broken ground in 2023, making it the lowest year for construction starts since 2011. If this trend continues, the type of space most in demand—newly constructed units—will have the shortest supply.

Related Stories

| Oct 5, 2012

2012 Reconstruction Award Bronze Winner: DPR Construction, Phoenix Regional Office, Phoenix, Ariz.

Working with A/E firm SmithGroupJJR, DPR converted a vacant 16,533-sf one-time “adult-themed boutique” in the city’s reemerging Discovery Triangle into a LEED-NC Platinum office, one that is on target to be the first net-zero commercial office building in Arizona.

| Oct 5, 2012

2012 Reconstruction Award Bronze Winner: Walsh Group Training and Conference Center, Chicago, Ill.

With its Building Team partners—architect Solomon Cordwell Buenz, structural engineer CS Associates, and M/E engineer McGuire Engineers—Walsh Construction, acting as its own contractor, turned the former automobile showroom and paperboard package facility into a 93,000-sf showcase of sustainable design and construction.

| Oct 4, 2012

2012 Reconstruction Awards Gold Winner: Rice Fergus Miller Office & Studio, Bremerton, Wash.

Rice Fergus Miller bought a vacant and derelict Sears Auto and converted the 30,000 gsf space into the most energy-efficient commercial building in the Pacific Northwest on a construction budget of around $100/sf.

| Sep 24, 2012

Reed Construction completes Lafarge headquarters in Chicago

Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.

| Sep 13, 2012

Margulies Perruzzi Architects completes office design for Pioneer Investments

MPA updated the office design and additional support space consisting of five floors at Pioneer’s Boston office located at 60 State Street.

| Sep 11, 2012

New York City releases first energy benchmarking data for private buildings

City is first in U.S. to disclose private-sector building energy data from a mandatory benchmarking policy.

| Sep 7, 2012

Goettsch Partners designs new tower in Abu Dhabi

Al Hilal Bank’s 24-story flagship development provides contemporary office space.

| Sep 7, 2012

Suffolk awarded One Channel Center project in Boston

Firm to manage $125 million, 525,000-sf office building project.

| Sep 7, 2012

Manhattan Construction Co. to build Fairfax office building

Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.

| Aug 21, 2012

Hong Kong’s first LEED Platinum pre-certified building opens

Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021