The Beck Group has been awarded The 2012 Build Georgia Award by the Associated General Contractors of America (AGC) for its Cave Spring Rehabilitation Center project.
Beck was the Construction Manager at Risk on the project which was completed on budget by the defined completion date, with zero lost-time accidents.
The Georgia Department of Labor’s Cave Spring Rehabilitation Center provides job and life skills training for people with disabilities, specializing in those with hearing impairments. As part of the project, The Beck Group replaced 50-year-old buildings with a state-of-the-art campus facility that allows for the future expansion of client services. Project plans included designing the new facilities with ADA Plus capabilities, which emphasizes accessibility and technology to meets the needs of those with disabilities.
The end result produced a 17,690-sf classroom/administration building and a 19,690-sf,, two-story dormitory with 52 beds, a restaurant-style kitchen and hotel grade laundry facilities.
Both structures were built to accommodate and train students in the food services and hotel industries and were also equipped with a message board and visual convenience/emergency notification system specifically tailored to those with hearing impairments. Additionally, two teaching greenhouses, an outdoor amphitheater, basketball court, dog walking park and walking trails were completed.
With this achievement, The Beck Group has accumulated more than 500 construction, design, real estate and organizational awards, including Fortune’s 100 Best Places to Work. The company’s craftsmanship and respectful rapport with clients, subcontractors and industry colleagues contributes to Beck’s reputation for delivering Better Buildings, Better Built. +
Related Stories
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Cultural Facilities | Apr 6, 2015
Berkeley’s West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certified building.
Codes and Standards | Apr 6, 2015
Industry groups petition for change order reform on federal projects
Nine design and construction associations ask for assurance that funds available for additional work.
High-rise Construction | Apr 6, 2015
Melbourne tower will light up depending on weather
The tower will be illuminated by 164-foot-tall beams of LED light based on weather updates from the Bureau of Meteorology.
BIM and Information Technology | Apr 3, 2015
French startup develops drone camera that overlays video with 3D images
The new drones can capture video and overlay the shot results with 3D images and augmented reality remotely.
Libraries | Apr 2, 2015
6 award-winning libraries showcase next-gen design strategies
The new Cedar Rapids Public Library and the restored Slover Library in Norfolk, Va., are among six breakthrough projects honored with 2015 AIA/ALA Library Building Awards.