flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Beam on Farmer, Arizona’s first mass timber, multi-story office building tops out

Office Buildings

The Beam on Farmer, Arizona’s first mass timber, multi-story office building tops out

Mortenson will house its Arizona operations in five-story, 184,000-sf structure.
 


By Peter Fabris, Contributing Editor | February 23, 2022
The Beam on Farmer Rendering
The Beam on Farmer is a mass timber, multi-story building in Arizona. Renderings courtesy RSP Architects

The Beam on Farmer, Arizona’s first mass timber, multi-story office building, topped out on Feb. 10, 2022.
 
The five-story, 184,000-sf structure, located in downtown Tempe, is the first in the state to feature exposed Cross Laminated Timber (CLT) construction as the primary structural system. Mortenson, the general contractor, plans to move its Arizona operations to the building when it opens this summer.
 
CLT fabricator, Holzpak, manufactured 194 CLT columns, 1,170 CLT beams, and 893 CLT decks weighing more than 4.5 million pounds for the structure. Some 79 shipping containers transported the building materials from Austria to the project site.
 
The interior will feature 13-foot exposed wood ceilings and 40,000 sf open floorplates. An Under Floor Air Distribution (UFAD) system will provide high air quality and energy efficiency. In the wake of the COVID-19 Pandemic, employee confidence in a clean, safe, and healthy work environment is a priority for owners. The Beam on Farmer is positioned to deliver one of the healthiest office building environments in the state, according to a news release. It will offer higher air quality and a contactless user experience.

The Beam on Farmer Interior Rendering
The Beam on Farmer interior includes wood ceilings.


 The CLT manufacturing process uses young trees, combining layers of natural timber and creates zero waste. The building will sequester almost 2,600 metric tons of carbon. Scrap material from CLT production is used to create other products or biofuel.
 
The building will feature a flexible office design and unique creative environment, the release says. It is nearby numerous attractions and amenities in Tempe. The building’s parking garage will feature a 4/1,000 parking ratio. The Phoenix office of JLL is the building’s exclusive leasing broker.
 
Mortenson and the construction team were recognized at the topping out ceremony for working 68,697 hours since groundbreaking without a single injury. The project team has volunteered for Habitat for Humanity and helped to raise donations for Southwest Human Development.
 
Owner and/or developer: Mortenson, PGIM Real Estate, Urban Development Partners
Design architect: RSP Architects
Architect of record: RSP Architects
MEP engineer: IMEG (Formerly MSA Engineering Consultants)
Structural engineer: PK Associates
General contractor/construction manager: Mortenson

Related Stories

Office Buildings | Sep 30, 2016

How to choose the right amenities for your office

No matter how lavish the amenities, they’ll prove ineffective in making any kind of positive impact if they don’t align to a company’s culture and the characteristics that make an organization unique, write Gensler’s Lena Kitson and Kimberly Foster.

High-rise Construction | Sep 23, 2016

A massive redevelopment in Tokyo reunites developer and architect

Mitsui Fudosan and SOM join forces to create OH-1, a mixed-use complex with a prominent public square.

Office Buildings | Sep 22, 2016

‘Floating’ triangular glass building from Foster + Partners breaks ground in Copenhagen

The glass building provides the illusion of floating above a stone plinth.

Office Buildings | Sep 20, 2016

Sterling Bay proposes SOM-designed office tower near Chicago’s newly opened Transit Center at Union Station

The building is one of several projects that are filling this developer’s plate in this city.

Office Buildings | Sep 8, 2016

Taipei’s Lè Architecture, designed by Aedas, is almost complete

The 18-story building is designed to resemble a moss-covered river pebble in Taipei’s Nangang District.

Office Buildings | Sep 2, 2016

Eight-story digital installation added as part of ESI Design’s renovation of Denver’s Wells Fargo Center

The crown jewel of a three-year makeover project, the LED columns bring the building’s lobby to life.

Codes and Standards | Sep 1, 2016

Overuse of air conditioning hurts office productivity

A study found temperatures in the low 70s reduce worker performance.

| Aug 12, 2016

OFFICE GIANTS: Technology is giving office workers the chance to play musical chairs

Technology is redefining how offices function and is particularly salient in the growing trend of "hoteling" and "hot seating" or "free addressing."

| Aug 12, 2016

Top 70 Office Engineering Firms

Jacobs, AECOM, and Thornton Tomasetti top Building Design+Construction’s annual ranking of the nation’s largest office sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.

| Aug 12, 2016

Top 100 Office Construction Firms

Turner Construction Co., Structure Tone, and Gilbane Building Co. top Building Design+Construction’s annual ranking of the nation’s largest office sector construction and construction management firms, as reported in the 2016 Giants 300 Report.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021