flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Beam on Farmer, Arizona’s first mass timber, multi-story office building tops out

Office Buildings

The Beam on Farmer, Arizona’s first mass timber, multi-story office building tops out

Mortenson will house its Arizona operations in five-story, 184,000-sf structure.
 


By Peter Fabris, Contributing Editor | February 23, 2022
The Beam on Farmer Rendering
The Beam on Farmer is a mass timber, multi-story building in Arizona. Renderings courtesy RSP Architects

The Beam on Farmer, Arizona’s first mass timber, multi-story office building, topped out on Feb. 10, 2022.
 
The five-story, 184,000-sf structure, located in downtown Tempe, is the first in the state to feature exposed Cross Laminated Timber (CLT) construction as the primary structural system. Mortenson, the general contractor, plans to move its Arizona operations to the building when it opens this summer.
 
CLT fabricator, Holzpak, manufactured 194 CLT columns, 1,170 CLT beams, and 893 CLT decks weighing more than 4.5 million pounds for the structure. Some 79 shipping containers transported the building materials from Austria to the project site.
 
The interior will feature 13-foot exposed wood ceilings and 40,000 sf open floorplates. An Under Floor Air Distribution (UFAD) system will provide high air quality and energy efficiency. In the wake of the COVID-19 Pandemic, employee confidence in a clean, safe, and healthy work environment is a priority for owners. The Beam on Farmer is positioned to deliver one of the healthiest office building environments in the state, according to a news release. It will offer higher air quality and a contactless user experience.

The Beam on Farmer Interior Rendering
The Beam on Farmer interior includes wood ceilings.


 The CLT manufacturing process uses young trees, combining layers of natural timber and creates zero waste. The building will sequester almost 2,600 metric tons of carbon. Scrap material from CLT production is used to create other products or biofuel.
 
The building will feature a flexible office design and unique creative environment, the release says. It is nearby numerous attractions and amenities in Tempe. The building’s parking garage will feature a 4/1,000 parking ratio. The Phoenix office of JLL is the building’s exclusive leasing broker.
 
Mortenson and the construction team were recognized at the topping out ceremony for working 68,697 hours since groundbreaking without a single injury. The project team has volunteered for Habitat for Humanity and helped to raise donations for Southwest Human Development.
 
Owner and/or developer: Mortenson, PGIM Real Estate, Urban Development Partners
Design architect: RSP Architects
Architect of record: RSP Architects
MEP engineer: IMEG (Formerly MSA Engineering Consultants)
Structural engineer: PK Associates
General contractor/construction manager: Mortenson

Related Stories

Office Buildings | Feb 13, 2018

Office market vacancy rate at 10-year low

Cautious development and healthy absorption across major markets contributed to the decline in vacancy, according to a new Transwestern report.

Office Buildings | Feb 8, 2018

Custom home or corporate office? Investment firm wanted both

Designed by Vertical Arts Architecture, the building features design elements found in high-end custom homes in the region.

Office Buildings | Feb 8, 2018

The American Psychiatric Association moves into The Wharf

The new office occupies 3 floors at 800 Main Avenue SW.

Wood | Feb 5, 2018

The largest timber office building in the U.S. will anchor Newark, N.J. mixed-use development

Michael Green Architecture is designing the building.

Green | Jan 30, 2018

Welcome to the Jungle: Amazon’s Spheres have opened to employees and the public

The Spheres provide the most unique aspect of Amazon’s downtown Seattle headquarters.

Office Buildings | Jan 18, 2018

At the ready: spec suites make hard-to-rent office space more attractive

Filling a need for startups looking for quick move-ins.

Office Buildings | Jan 18, 2018

*UPDATED* Amazon narrows list of possible HQ2 locations down to 20 cities

The company expects to invest over $5 billion in construction and grow HQ2 to include as many as 50,000 jobs.

Office Buildings | Jan 3, 2018

Activating the workplace

Here's how active work stations impact how you think, perform, and feel.

Office Buildings | Dec 19, 2017

How do we measure human performance, and what does it mean for the workplace?

There are many new tools and methods that are beginning to look more comprehensively to evaluate organizational well-being.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021