Building Design+Construction won a total of six awards for editorial and graphic excellence in the 2012 ASBPE business-to-business journalism competition: two National awards for “‘The Owner’s Perspective’ Series” and “Construction Waste Management,” as well as three regional awards for “Editorials,” the May 2011 White Paper on “Zero and Net-zero Energy Buildings + Homes”; and a profile of EYP Architecture & Engineering—a BD+C “Best AEC Firm to Work For” winner—in December 2011.
BD+C Designer Elena Mengarelli won a regional Graphics Excellence Award for the design of “Living Buildings: Are AEC Firms Up to the Challenge? (September 2011).
“Construction Waste Management” was written by Scott Grogan, LEED AP BD+C, Scott Bollmann, LEED AP BD+C, Robynn Selle, JD, LEED AP, and Chrisie Ambrass, of Turner Construction Co. This AIA/CES course (September 2011) was also a Finalist for the Jesse H. Neal Award, the highest honor in B2B journalism. +
Related Stories
| Jul 23, 2014
Tallest skyscraper in South Korea now open
The Northeast Asia Trade Tower stands at 308 meters and is the focal point of the Songdo International Business District, a new 310-hectare city built on reclaimed land.
| Jul 23, 2014
Architecture Billings Index up nearly a point in June
AIA reported the June ABI score was 53.5, up from a mark of 52.6 in May.
| Jul 22, 2014
L.A.'s tallest tower to get observation deck
U.S. Bank Tower, as part of a series of improvements, will be getting an observation deck and restaurant at its top.
| Jul 22, 2014
Herzog & de Meuron unveil curvy concrete condo in Manhattan
Herzog & de Meuron have released renderings of their new $250 million New York building, a 12-story condominium with 88 luxury apartments.
| Jul 21, 2014
Narrowing the field: Stirling Prize shortlist announced
The list includes first-time nominees Mecanoo and Renzo Piano Building Workshop, as well as previous winners Zaha Hadid Architects and Feilden Clegg Bradley Studios.
| Jul 21, 2014
Designing the process of leadership transition
Transition planning can be one of the more complex challenges that firms face. Effective plans begin by determining the gap between a firm’s current state and the future it envisions for itself. SPONSORED CONTENT
| Jul 21, 2014
16 utility questions to answer during your building project
We need electricity to power our building projects, along with water and gas and a faultless sanitation system. That’s what we think about when we think about utility requirements for our building project, but are we missing something? SPONSORED CONTENT
| Jul 21, 2014
Commercial real estate development growing at strongest pace since recovery began: NAIOP report
Industrial, warehousing, office, and retail sectors see strong gains; Texas leads the nation in construction-value stats.
| Jul 21, 2014
Economists ponder uneven recovery, weigh benefits of big infrastructure [2014 Giants 300 Report]
According to expert forecasters, multifamily projects, the Panama Canal expansion, and the petroleum industry’s “shale gale” could be saving graces for commercial AEC firms seeking growth opportunities in an economy that’s provided its share of recent disappointments.
| Jul 21, 2014
Workplace trends survey reveals generational patterns in office use
Data analysis from Mancini•Duffy indicates significant variations among age cohorts in the workplace.