flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BD+C Under 40 Leadership Summit scheduled

BD+C Under 40 Leadership Summit scheduled

Attendee registration for U40 Summit II now open.


By Posted by Tim Gregorski, Senior Editor | July 16, 2012
This article first appeared in the August 2012 issue of BD+C.

The BD+C Under 40 Leadership Summit II will be held in Chicago from noon, Oct. 3 to 1 p.m., Oct. 5, 2012.  The event will be held at the historic Hotel Monaco, with breakout meetings across the street at the AIA Chicago headquarters.

Similar to last year’s inaugural event, the Under 40 Leadership Summit II will bring together members of “the next generation of AEC Industry leaders.”

This year’s focus is on CREATIVITY.

Our featured presenter, Autodesk Fellow Tom Wujec, is a thought leader in personal and team creativity, technology innovation, and visual strategy.  He is the author and editor of several books, an adjunct professor at Singularity University, a TED Conference speaker and a pioneer in the emerging practice of business visualization

Wujec will guide U40 Summit II participants through a series of interactive group activities that will stimulate their creative strategic planning processes through proven visualization techniques: making ideas visible, tangible, and persistent, and thereby building collaboration that yields clarity in problem-solving.

But there’s more. We’ll be touring leading Chicago-based AEC firms and noteworthy current projects. And there’ll be plenty of opportunity to network with other U40s. 

To start your registration, and for more details go to: bdcnetwork.com/under40summit. +

Related Stories

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021