flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BD+C Under 40 Leadership Summit scheduled

BD+C Under 40 Leadership Summit scheduled

Attendee registration for U40 Summit II now open.


By Posted by Tim Gregorski, Senior Editor | July 16, 2012
This article first appeared in the August 2012 issue of BD+C.

The BD+C Under 40 Leadership Summit II will be held in Chicago from noon, Oct. 3 to 1 p.m., Oct. 5, 2012.  The event will be held at the historic Hotel Monaco, with breakout meetings across the street at the AIA Chicago headquarters.

Similar to last year’s inaugural event, the Under 40 Leadership Summit II will bring together members of “the next generation of AEC Industry leaders.”

This year’s focus is on CREATIVITY.

Our featured presenter, Autodesk Fellow Tom Wujec, is a thought leader in personal and team creativity, technology innovation, and visual strategy.  He is the author and editor of several books, an adjunct professor at Singularity University, a TED Conference speaker and a pioneer in the emerging practice of business visualization

Wujec will guide U40 Summit II participants through a series of interactive group activities that will stimulate their creative strategic planning processes through proven visualization techniques: making ideas visible, tangible, and persistent, and thereby building collaboration that yields clarity in problem-solving.

But there’s more. We’ll be touring leading Chicago-based AEC firms and noteworthy current projects. And there’ll be plenty of opportunity to network with other U40s. 

To start your registration, and for more details go to: bdcnetwork.com/under40summit. +

Related Stories

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

| Feb 27, 2012

Consigli complete first building for Bigelow Ocean Sciences Campus

Designed by WBRC Architects Engineers in association with Perkins + Will.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021