The Building Commissioning Association (BCA) officially released its New Construction Building Commissioning Best Practices. This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.
This document represents a collaborative effort on the part of several leading experts in the field of commissioning. Bruce Pitts of Wood Harbinger, Inc and Karl Stum of Summit Building Engineering spearheaded this two-year effort.
According to its authors, it aims to promote commissioning in the marketplace by defining the qualities and characteristics of best commissioning practices and to raise professional standards by establishing a benchmark against which the market can gauge quality and professionalism, and which the BCA can use to objectively evaluate other commissioning initiatives, including their own.
“I am proud of this Best Practices document,” stated BCA President Mark F. Miller, PE, CCP. “A unique and valuable aspect of this document is to identify several of the most common issues, pitfalls and challenges that BCA members see in the industry related to the practice of commissioning new construction and major renovation projects. Our hopes are that by highlighting these challenges and identifying proven strategies for overcoming them that this will heighten awareness and understanding and lead the industry to overcome these problems while promoting quality and standardization in the industry.”
New Construction Building Commissioning Best Practices draws upon existing resources such as the BCA’s own Building Commissioning Handbook, NEBB Procedural Standards for “Whole Building Systems Commissioning of New Construction”, National Institute of Building Science (NIBS) “Whole Building Design Guide”, ASHRAE Guideline 0-2005, ASHRAE Guideline 1.1-2007 and the USGBC LEED rating system.
Best Practices in Commissioning Existing Building is available in its entirety on the BCA website at www.bcxa.org. BD+C
Related Stories
| May 31, 2012
2011 Reconstruction Awards Profile: Ka Makani Community Center
An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.