flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Batteries are the next step in raising sustainability standards

Codes and Standards

Batteries are the next step in raising sustainability standards

Battery technology will reduce electricity costs and promote a more stable, flexible grid.


By Peter Fabris, Contributing Editor | January 12, 2016
Batteries are the next step in raising sustainability standards

Courtesy Tesla

A California developer believes grid-connected batteries represent the next step in advancing electric efficiency standards on its development portfolio.

The Irvine Co. and Advanced Microgrid Solutions recently installed 16 Tesla PowerPack battery systems at an office tower. It was the first installation in what will be a fleet of Irvine Co. Hybrid-Electric Buildings that will be used for grid support by Southern California Edison. 

The hybrid-electric building, as an Irvine executive calls it, charges its battery system on off-peak hours and later discharges the battery during times of peak energy use. This reduces the energy drawn from the electricity grid during peak periods.

The result is lower electricity costs (10% savings or more) and a more stable and flexible electric grid. With large users drawing power from batteries during peak times, utilities can avoid starting additional power plants to serve peak loads, thereby reducing associated greenhouse-gas emissions.

Battery storage can also be combined with photovoltaic panels, providing additional cost savings and environmental benefits.

Related Stories

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021