flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Batson-Cook appoints Rygiel VP/Business Development for Tampa office

Batson-Cook appoints Rygiel VP/Business Development for Tampa office

Member of BD+C's "40 Under 40" Class of 2012 will concentrate on private-development clients in Florida.


By Batson-Cook | June 20, 2014

Tampa, Florida (June 19, 2014) – Contractor Batson-Cook has named Frank J. Rygiel, LEED AP,the Vice President of Business Development for its Tampa office.  In this new position, Mr. Rygiel will be responsible for cultivating and maintaining business relationships in the state of Florida, concentrating his efforts on expanding the firm’s presence in the state’s private development sector.

Mr. Rygiel most recently served as Senior Project Manager with Batson-Cook, managing in excess of $100 million in projects.  He has been integral to the firm’s projects with the School District of Hillsborough County, leading the construction of the Stowers Elementary and Barrington Middle School combined campus in Lithia.  His multi-family work has included the construction of The Portland apartments in St. Petersburg, and SkyHouse Orlando, a 23-story luxury high-rise apartment project in downtown Orlando. 

A graduate of East Carolina University, Mr. Rygiel is a member of Leadership Pasco’s Class of 2011 and Leadership Tampa Bay’s Class of 2013.  His work has been recognized nationally, regionally and locally, as he achieved the following designations in 2012: Building Design+Construction Top 40 Under 40, Engineering News Record Southeast Top 20 Under 40  and the Tampa Bay Business Journal “Up and Comer”.  He also serves on the Board of Directors for Pasco-Hernando State College Foundation and Lutz Preparatory School, and is the Sergeant-at-Arms of The Rotary Club of Wesley Chapel Sunrise.

Batson-Cook Construction, founded in 1915, builds a wide range of commercial projects for healthcare, industrial, manufacturing and private development clients throughout the Southeast. We have the heart of a family-owned general contractor with the reach of a global construction firm. We build with passion. We operate with integrity. For more information visit www.batson-cook.com.

Related Stories

| Nov 2, 2010

A Look Back at the Navy’s First LEED Gold

Building Design+Construction takes a retrospective tour of a pace-setting LEED project.

| Nov 2, 2010

Wind Power, Windy City-style

Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021