Tampa, Florida (June 19, 2014) – Contractor Batson-Cook has named Frank J. Rygiel, LEED AP,the Vice President of Business Development for its Tampa office. In this new position, Mr. Rygiel will be responsible for cultivating and maintaining business relationships in the state of Florida, concentrating his efforts on expanding the firm’s presence in the state’s private development sector.
Mr. Rygiel most recently served as Senior Project Manager with Batson-Cook, managing in excess of $100 million in projects. He has been integral to the firm’s projects with the School District of Hillsborough County, leading the construction of the Stowers Elementary and Barrington Middle School combined campus in Lithia. His multi-family work has included the construction of The Portland apartments in St. Petersburg, and SkyHouse Orlando, a 23-story luxury high-rise apartment project in downtown Orlando.
A graduate of East Carolina University, Mr. Rygiel is a member of Leadership Pasco’s Class of 2011 and Leadership Tampa Bay’s Class of 2013. His work has been recognized nationally, regionally and locally, as he achieved the following designations in 2012: Building Design+Construction Top 40 Under 40, Engineering News Record Southeast Top 20 Under 40 and the Tampa Bay Business Journal “Up and Comer”. He also serves on the Board of Directors for Pasco-Hernando State College Foundation and Lutz Preparatory School, and is the Sergeant-at-Arms of The Rotary Club of Wesley Chapel Sunrise.
Batson-Cook Construction, founded in 1915, builds a wide range of commercial projects for healthcare, industrial, manufacturing and private development clients throughout the Southeast. We have the heart of a family-owned general contractor with the reach of a global construction firm. We build with passion. We operate with integrity. For more information visit www.batson-cook.com.
Related Stories
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.
| May 23, 2012
MBI Modular Construction Campus Launched on BDCUniversity.com
White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.