flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Bank of America Plaza becomes Atlanta's priciest repo

Bank of America Plaza becomes Atlanta's priciest repo

Repo will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants.


By J. Scott Trubey, the Atlanta Journal-Constitution | March 27, 2012
The Bank of America Plaza in Atlanta was taken back by its lender at a foreclosu
The Bank of America Plaza in Atlanta was taken back by its lender at a foreclosure auction.

One of the biggest emblems of Atlanta's real estate boom became the biggest emblem of its bust recently.

Bank of America Plaza, the South’s tallest skyscraper and an Atlanta skyline icon, was taken back by its lender at a foreclosure auction at the Fulton County Courthouse. The 55-story tower, bought for a record price in 2006 by a California real estate firm, is now metro Atlanta’s priciest repossession.

A lawyer for LNR Partners placed two "credit bids" totaling $250 million. That means it essentially bid not with cash but rather the lender's own interest in the building. LNR represents the lender, a commercial mortgage-backed security owned by investors. The lender is likely to seek a new buyer, who will likely spruce up the tower and try to attract new tenants.

The building's distress stemmed from its last sale at the very height of the real estate boom. The prior owner, BentleyForbes bought the trophy tower for $436 million from Cousins Properties and Bank of America in 2006. Soon after, office vacancies soared and property values and rents plummeted following the economic collapse.

Timeline of a tower
Late 1980s -- C&S Bank and Cousins Properties announce plans for a new C&S headquarters, to be Atlanta’s tallest building, at 600 Peachtree Street.
1991 -- C&S/Sovran is acquired by Charlotte-based NCNB and becomes NationsBank, a precursor to Bank of America.
1992 – The 55-story, more than 1,000-foot building opens as NationsBank Plaza.
1999 – The tower’s name officially changes to Bank of America Plaza after NationsBank acquires Bank of America and takes its name.
2006 – California real estate firm BentleyForbes buys Bank of America Plaza from Bank of America and Cousins Properties for an Atlanta-record $436 million.
2011 – Fitch Ratings issues a report stating Bank of America Plaza is in “imminent default” and a special servicer has been brought in to help work out the troubled debt.
2012 – Bank of America Plaza is foreclosed.

An executive with BentleyForbes said in a statement the firm worked with LNR “for more than a year to identify a viable way forward,” and that transferring control to LNR and the bond holders was the best way forward.

The 1,023-ft tower is a garnet-hued obelisk when the sunset plays off its Napoleon red granite façade. Its 50-ton spire is splashed with 23-karat gold leaf.

The building was planned as the headquarters of C&S Bank in the late 1980s. It was later renamed for successors NationsBank and ultimately Bank of America.

The tower may not be the last signature office or retail complex to change owners. Delinquency rates for commercial mortgage backed securities, or CMBS, just one type of loan for commercial properties, remains near all-time highs in metro Atlanta, according to real estate research firm Trepp.

Bank of America Plaza By the Numbers
23 – The 50-ton spire at the top of Bank of America Plaza is covered in 23-karat gold leaf
55—Floors in the building
1,023 – Bank of America Plaza is 1,023 feet tall.
1.28 million – The total square footage of Bank of America Plaza
Architect: Kevin Roche, John Dinkeloo and Associates

A total of $2.54 billion in CMBS loans, or 20% of the value of all such loans, were past-due in metro Atlanta in January, according to Trepp. The delinquency figure nationwide was 9.52%.

Borrowers have struggled to refinance given falling values and trouble filling vacancies. Major banks and institutional investors also lent on commercial property, but CMBS loans, which typically make higher leveraged loans at high interest rates, became popular last decade. Their use peaked in 2007. Many CMBS loans come due in five years, making 2012 a feared year.

“I think unfortunately we’re only in about the third or fourth inning," said Henry Lorber, an expert in distressed real estate and a managing director at Atlanta-based Hays Financial Consulting.

Big-name tenants filled Bank of America Plaza when BentleyForbes bought it. But the owners soon had to grapple with the Great Recession, corporate cutbacks in office space and a glut of competing new space in Midtown and Buckhead. Ernst & Young left a few years ago and law firm Troutman Sanders and Bank of America reduced their space. Law firm Paul Hastings also is leaving for another building. In metro Atlanta, vacancy remained near record highs in the third quarter 2011 at 16.9%, according to CoStar Group, with rents at $18.36 per square foot, down from $20.28 in 2008.

Gil Burstiner, commercial real estate partner at the law firm of Hartman Simons, said the ordeal will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants. BD+C

Related Stories

High-rise Construction | Dec 7, 2022

SOM reveals its design for Singapore’s tallest skyscraper

Skidmore, Owings & Merrill (SOM) has revealed its design for 8 Shenton Way—a mixed-use tower that will stand 63 stories and 305 meters (1,000 feet) high, becoming Singapore’s tallest skyscraper. The design team also plans to make the building one of Asia’s most sustainable skyscrapers. The tower incorporates post-pandemic design features.

Office Buildings | Dec 7, 2022

Software giant SAP opens engineering academy for its global engineering workforce

Software giant SAP has opened its new SAP Academy for Engineering on the company’s San Ramon, Calif. campus. Designed by HGA, the Engineering Academy will provide professional development opportunities for SAP’s global engineering workforce. At the Engineering Academy, cohorts from SAP offices across the globe will come together for intensive, six-month training programs.

Multifamily Housing | Dec 7, 2022

Canada’s largest net-zero carbon residential community to include affordable units

The newly unveiled design for Canada’s largest net-zero carbon residential community includes two towers that will create a new destination within Ottawa and form a striking gateway into LeBreton Flats. The development will be transit-oriented, mixed-income, mixed-use, and include unprecedented sustainability targets. Dream LeBreton is a partnership between real estate companies Dream Asset Management, Dream Impact, and local non-profit MultiFaith Housing Initiative.

Student Housing | Dec 7, 2022

Cornell University builds massive student housing complex to accommodate planned enrollment growth

In Ithaca, N.Y., Cornell University has completed its North Campus Residential Expansion (NCRE) project. Designed by ikon.5 architects, the 776,000-sf project provides 1,200 beds for first-year students and 800 beds for sophomore students. The NCRE project aimed to accommodate the university’s planned growth in student enrollment while meeting its green infrastructure standards. Cornell University plans to achieve carbon neutrality by 2035.

Office Buildings | Dec 6, 2022

‘Chicago’s healthiest office tower’ achieves LEED Gold, WELL Platinum, and WiredScore Platinum

Goettsch Partners (GP) recently completed 320 South Canal, billed as “Chicago’s healthiest office tower,” according to the architecture firm. Located across the street from Chicago Union Station and close to major expressways, the 51-story tower totals 1,740,000 sf. It includes a conference center, fitness center, restaurant, to-go market, branch bank, and a cocktail lounge in an adjacent structure, as well as parking for 324 cars/electric vehicles and 114 bicycles.

Multifamily Housing | Dec 6, 2022

Austin's new 80-story multifamily tower will be the tallest building in Texas

Recently announced plans for Wilson Tower, a high-rise multifamily building in downtown Austin, Texas, indicate that it will be the state’s tallest building when completed. The 80-floor structure will rise 1,035 feet in height at 410 East 5th Street, close to the 6th Street Entertainment District, Austin Convention Center, and a new downtown light rail station.

Geothermal Technology | Dec 6, 2022

Google spinoff uses pay-as-you-go business model to spur growth in geothermal systems

Dandelion Energy is turning to a pay-as-you-go plan similar to rooftop solar panel leasing to help property owners afford geothermal heat pump systems.

Contractors | Dec 6, 2022

Slow payments cost the construction industry $208 billion in 2022

The cost of floating payments for wages and invoices represents $208 billion in excess cost to the construction industry, a 53% increase from 2021, according to a survey by Rabbet, a provider of construction finance software.

Mixed-Use | Dec 6, 2022

Houston developer plans to convert Kevin Roche-designed ConocoPhillips HQ to mixed-use destination

Houston-based Midway, a real estate investment, development, and management firm, plans to redevelop the former ConocoPhillips corporate headquarters site into a mixed-use destination called Watermark District at Woodcreek.

Office Buildings | Dec 5, 2022

How to foster collaboration and inspiration for a workplace culture that does not exist (yet)

A building might not be able to “hack” innovation, but it can create the right conditions to foster connection and innovation, write GBBN's Chad Burke and Zachary Zettler.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021