One of the biggest emblems of Atlanta's real estate boom became the biggest emblem of its bust recently.
Bank of America Plaza, the South’s tallest skyscraper and an Atlanta skyline icon, was taken back by its lender at a foreclosure auction at the Fulton County Courthouse. The 55-story tower, bought for a record price in 2006 by a California real estate firm, is now metro Atlanta’s priciest repossession.
A lawyer for LNR Partners placed two "credit bids" totaling $250 million. That means it essentially bid not with cash but rather the lender's own interest in the building. LNR represents the lender, a commercial mortgage-backed security owned by investors. The lender is likely to seek a new buyer, who will likely spruce up the tower and try to attract new tenants.
The building's distress stemmed from its last sale at the very height of the real estate boom. The prior owner, BentleyForbes bought the trophy tower for $436 million from Cousins Properties and Bank of America in 2006. Soon after, office vacancies soared and property values and rents plummeted following the economic collapse.
Timeline of a tower
Late 1980s -- C&S Bank and Cousins Properties announce plans for a new C&S headquarters, to be Atlanta’s tallest building, at 600 Peachtree Street.
1991 -- C&S/Sovran is acquired by Charlotte-based NCNB and becomes NationsBank, a precursor to Bank of America.
1992 – The 55-story, more than 1,000-foot building opens as NationsBank Plaza.
1999 – The tower’s name officially changes to Bank of America Plaza after NationsBank acquires Bank of America and takes its name.
2006 – California real estate firm BentleyForbes buys Bank of America Plaza from Bank of America and Cousins Properties for an Atlanta-record $436 million.
2011 – Fitch Ratings issues a report stating Bank of America Plaza is in “imminent default” and a special servicer has been brought in to help work out the troubled debt.
2012 – Bank of America Plaza is foreclosed.
An executive with BentleyForbes said in a statement the firm worked with LNR “for more than a year to identify a viable way forward,” and that transferring control to LNR and the bond holders was the best way forward.
The 1,023-ft tower is a garnet-hued obelisk when the sunset plays off its Napoleon red granite façade. Its 50-ton spire is splashed with 23-karat gold leaf.
The building was planned as the headquarters of C&S Bank in the late 1980s. It was later renamed for successors NationsBank and ultimately Bank of America.
The tower may not be the last signature office or retail complex to change owners. Delinquency rates for commercial mortgage backed securities, or CMBS, just one type of loan for commercial properties, remains near all-time highs in metro Atlanta, according to real estate research firm Trepp.
Bank of America Plaza By the Numbers
23 – The 50-ton spire at the top of Bank of America Plaza is covered in 23-karat gold leaf
55—Floors in the building
1,023 – Bank of America Plaza is 1,023 feet tall.
1.28 million – The total square footage of Bank of America Plaza
Architect: Kevin Roche, John Dinkeloo and Associates
A total of $2.54 billion in CMBS loans, or 20% of the value of all such loans, were past-due in metro Atlanta in January, according to Trepp. The delinquency figure nationwide was 9.52%.
Borrowers have struggled to refinance given falling values and trouble filling vacancies. Major banks and institutional investors also lent on commercial property, but CMBS loans, which typically make higher leveraged loans at high interest rates, became popular last decade. Their use peaked in 2007. Many CMBS loans come due in five years, making 2012 a feared year.
“I think unfortunately we’re only in about the third or fourth inning," said Henry Lorber, an expert in distressed real estate and a managing director at Atlanta-based Hays Financial Consulting.
Big-name tenants filled Bank of America Plaza when BentleyForbes bought it. But the owners soon had to grapple with the Great Recession, corporate cutbacks in office space and a glut of competing new space in Midtown and Buckhead. Ernst & Young left a few years ago and law firm Troutman Sanders and Bank of America reduced their space. Law firm Paul Hastings also is leaving for another building. In metro Atlanta, vacancy remained near record highs in the third quarter 2011 at 16.9%, according to CoStar Group, with rents at $18.36 per square foot, down from $20.28 in 2008.
Gil Burstiner, commercial real estate partner at the law firm of Hartman Simons, said the ordeal will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants. BD+C
Related Stories
| Mar 2, 2011
Cities of the sky
According to The Wall Street Journal, the Silk Road of the future—from Dubai to Chongqing to Honduras—is taking shape in urban developments based on airport hubs. Welcome to the world of the 'aerotropolis.'
| Mar 2, 2011
How skyscrapers can save the city
Besides making cities more affordable and architecturally interesting, tall buildings are greener than sprawl, and they foster social capital and creativity. Yet some urban planners and preservationists seem to have a misplaced fear of heights that yields damaging restrictions on how tall a building can be. From New York to Paris to Mumbai, there’s a powerful case for building up, not out.
| Mar 1, 2011
Smart cities: getting greener and making money doing it
The Global Green Cities of the 21st Century conference in San Francisco is filled with mayors, architects, academics, consultants, and financial types all struggling to understand the process of building smarter, greener cities on a scale that's practically unimaginable—and make money doing it.
| Mar 1, 2011
How to make rentals more attractive as the American dream evolves, adapts
Roger K. Lewis, architect and professor emeritus of architecture at the University of Maryland, writes in the Washington Post about the rising market demand for rental housing and how Building Teams can make these properties a desirable choice for consumer, not just an economically prudent and necessary one.
| Mar 1, 2011
New survey shows shifts in hospital construction projects
America’s hospitals and health systems are focusing more on renovation or expansion than new construction, according to a new survey conducted by Health Facilities Management magazine and the American Society for Healthcare Engineering (ASHE). In fact, renovation or expansion accounted for 73% of construction projects at hospitals responding to the survey.
| Mar 1, 2011
AIA selects 6 communities for long-term sustainability program
The American Institute of Architects today announced it has selected 6 communities throughout the country to receive technical assistance under the Sustainable Design Assessment Team (SDAT) program in 2011. The communities selected are Shelburne, Vt., Apple Valley, Mn., Pikes Peak Region, Co., Southwest DeKalb County, Ga., Bastrop, Tx., and Santa Rosa, Ca. The SDAT program represents a significant institutional investment by the AIA in public service work to assist communities in developing policy frameworks and long term sustainability plans.
| Feb 24, 2011
Perkins+Will designs 100 LEED Certified buildings
Perkins+Will announced the Leadership in Energy and Environmental Design (LEED) certification of its 100th sustainable building, marking a key milestone for the firm and for the sustainable design industry. The Vancouver-based Dockside Green Phase Two Balance project marks the firm’s 100th LEED certified building and is tied for the highest scoring LEED building worldwide with its sister project, Dockside Green Phase One.
| Feb 24, 2011
New reports chart path to net-zero-energy commercial buildings
Two new reports from the Zero Energy Commercial Buildings Consortium (CBC) on achieving net-zero-energy use in commercial buildings say that high levels of energy efficiency are the first, largest, and most important step on the way to net-zero.
| Feb 24, 2011
Lending revives stalled projects
An influx of fresh capital into U.S. commercial real estate is bringing some long-stalled development projects back to life and launching new construction of apartments, office buildings and shopping centers, according to a Wall Street Journal article.
| Feb 23, 2011
London 2012: What Olympic Park looks like today
London 2012 released a series of aerial images that show progress at Olympic Park, including a completed roof on the stadium (where seats are already installed), tile work at the aquatic centre, and structural work complete on more than a quarter of residential projects at Olympic Village.