flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Balcony collapse in Berkeley, Calif., prompts an examination of codes

Codes and Standards

Balcony collapse in Berkeley, Calif., prompts an examination of codes

Steps beyond code can promote deck safety.


By Peter Fabris, Contributing Editor | June 24, 2015
Balcony collapse in Berkeley, Calif., prompts an examination of codes

The fatal accident in Berkeley, Calif., has led to a call for the review of codes and standards regarding balconies. Image: Pixabay

Dry rot and too much weight appear to be the causes of a fatal accident at an eight-year-old building in Berkeley, Calif. The tragedy has prompted at look at codes governing the structures.

Builders could take extra steps that go beyond what’s outlined in building codes. For example, advise owners that decks do not last forever and even the best-made structures have a lifespan of 15 years.

The North American Deck and Railing Association estimates that at least 40 million residential decks and 10 million commercial decks in the U.S. are at least 20 years old.

Educating the building’s owners about the importance of weight limits and maintenance can help keep the structures safe. Leaving a sign behind that posts the maximum capacity for the balcony or deck will inform the building owner. 

Other steps include: Advising the owner that a pileup of snow on a deck can be heavier than a group of people, and can lead an otherwise empty deck to collapse.

Related Stories

Codes and Standards | Oct 11, 2018

On-site staff key to energy benchmarking project for property management company

Manager training, data sharing are critical to meeting 20% utility cost reduction goal.

Codes and Standards | Oct 10, 2018

Interactive heat maps track temperature ranges in U.S. cities

Urban heat island effect can vary by as much as 37°F in the same city.

Codes and Standards | Oct 9, 2018

Power systems will become more decentralized for better disaster resiliency

Businesses, homeowners will control more power-generation capacity.

Codes and Standards | Oct 5, 2018

Getting commitments from key subs critical on government contracts

Withdrawn subcontractor bids can be costly.

Codes and Standards | Oct 4, 2018

Internal watchdog says EPA falling short to protect school children from asbestos

Agency not conducting enough inspections, report says.

Codes and Standards | Oct 3, 2018

Climate change impacts could prompt realignment of assets for commercial property developers

Strategies include reducing exposure to properties in flood-prone areas.

Codes and Standards | Oct 2, 2018

Political will, tougher standards needed to reach carbon neutral goal

Stretch codes, more stringent credentials for designers, contractors, and inspectors may be needed.

Codes and Standards | Sep 27, 2018

Natural light is the most prized office perk

Employees crave sunshine and views of the outdoors more than cafeterias, fitness centers, and childcare.

Codes and Standards | Sep 26, 2018

Industry consensus needed for multifamily energy efficiency retrofit approach

Choice of insulating materials can impact indoor air quality, resident health.

Codes and Standards | Sep 25, 2018

New market forces disrupting global real estate development industry

Executives concerned about trade policy, labor shortages, approval processes.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021