flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The average U.S. contractor has 9.2 months worth of construction work in the pipeline, as of August 2023

Contractors

The average U.S. contractor has 9.2 months worth of construction work in the pipeline, as of August 2023

Contractor backlogs dropped slightly in August, to 9.2 months, according to Associated Builders and Contractors.


By Associated Builders and Contractors | September 12, 2023
Image by Jason Goh from Pixabay
Image by Jason Goh from Pixabay

Associated Builders and Contractors' Construction Backlog Indicator declined to 9.2 months in August, down 0.1 month, according to an ABC member survey conducted from Aug. 21 to Sept. 6. The reading is 0.5 months above the August 2022 level.

Backlog decreased on a monthly basis for all categories of company size except for those with more than $100 million in annual revenues, while only the smallest two revenue categories have higher backlog than in August 2022.

ABC’s Construction Confidence Index reading for sales, profit margins and staffing levels moved higher in August. All three readings remain above the threshold of 50, indicating expectations of growth over the next six months.

“There’s no sign of a construction recession in the near term,” said ABC Chief Economist Anirban Basu. “If anything, contractors are more upbeat, as policy and technology shifts along with economic transformation, are creating substantial demand for improvements and growth in America’s built environment.

“While a plurality of contractors expects only small improvements in sales, profit margins and staffing over the next six months, even incremental improvement is remarkable in the context of tightening credit, higher project financing costs and lingering fears of recession,” said Basu. “Backlog continues to be at the upper end of historic levels, with the infrastructure category registering substantial gains in backlog in August. That suggests that a growing number of public works projects is poised to break ground.”

Construction Backlog Indicator declined to 9.2 months in August 2023

Construction Backlog Indicator declined to 9.2 months in August 2023

Related Stories

| Jul 20, 2012

Firms bracing for DoD cuts

The Giants 300 Top 25 AEC Firms in the Military sector.

| Jul 20, 2012

Gensler, Stantec, Turner lead ‘green’ firms

The Top 10 AEC Firms in Green Buildings and LEED Accredited Staff.

| Jul 19, 2012

Renovation resurgence cuts across sectors

Giants 300 reconstruction sector firms ‘pumping fresh blood in tired spaces.’

| Jul 19, 2012

AEC firms ready to dive into public projects

But the size of the pool keeps shrinking for the Top 25 AEC firms in the Government Sector.

| Jul 19, 2012

BIM finally starting to pay off for AEC firms

In surveying Giants 300 firms about BIM, we went right for the jugular: Is BIM paying off—through cost savings, higher quality, or client satisfaction? Here’s what they told us.

| Jul 19, 2012

Contractors finally ‘moving off the bottom’

C and CM Agent + PM Giants 300 Firms also taking steps to improve project efficiency.

| Jul 19, 2012

The best states for a construction job

The top anticipated engineering and skilled labor shortages according to a survey of 2,223 construction industry professionals.

| Jul 19, 2012

Suffolk Construction launches subcontractor development series

Professional certificate program to provide core construction management skills to disadvantaged, minority, and women business enterprises.

| Jul 19, 2012

Construction begins on military centers to treat TBI and PTS

First two of several centers to be built in Fort Belvoir, Va. and Camp Lejeune, N.C.

| Jul 18, 2012

U.S. engineering firms set sail for foreign ports

Other E/EA Giants 300 firms are just dipping their toes into foreign waters, still looking for international business but choosing not to establish additional offices.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021