flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The average U.S. contractor has 8.9 months worth of construction work in the pipeline, as of May 2023

Contractors

The average U.S. contractor has 8.9 months worth of construction work in the pipeline, as of May 2023

Contractor backlogs remained unchanged in May, at 8.9 months, according to Associated Builders and Contractors.


By Associated Builders and Contractors | June 13, 2023
The average U.S. contractor has 8.9 months worth of construction work in the pipeline, as of May 2023  Image by Denis Doukhan from Pixabay
Image by Denis Doukhan from Pixabay

Associated Builders and Contractors reported that its Construction Backlog Indicator remained unchanged at 8.9 months in May, according to an ABC member survey conducted May 20 to June 7. The reading is 0.1 months lower than in May 2022.

Backlog in the infrastructure category ticked up again and has now returned to May 2022 levels. On a regional basis, backlog increased in every region but the Northeast.

ABC’s Construction Confidence Index reading for sales and staffing levels moved lower in May while the reading for profit margins increased. All three readings remain above the threshold of 50, indicating expectations of growth over the next six months.

“During a period of ongoing tumult associated with major bank failures, a near-miss debt ceiling crisis and shifting monetary policy, nonresidential construction backlog has remained remarkably stable,” said ABC Chief Economist Anirban Basu. “At nearly nine months, backlog is essentially unchanged from a year ago and the previous month.

“Moreover, contractor confidence remains elevated despite massive increases in cost of capital and growing concerns over the nation’s commercial real estate segment, with firms indicating sufficient demand and associated pricing power that will keep profit margins steady or better,” said Basu. “Contractors also expect to bring on additional talent over the next six months, an indication of ongoing industry expansion."

ABC Construction Backlog May 2023.jpeg

ABC Construction Confidence Index

ABC Construction Backlog May 2023

 

Related Stories

| Jan 15, 2013

Hill International selected as PM for Secon Nile Towers in Cairo

The Secon Nile Towers will feature two 23-story buildings: one five-star hotel tower and one residential and retail tower.

| Jan 10, 2013

Guide predicts strongest, weakest AEC markets for 2013

2013 Guide to U.S. AEC markets touts apartments, natural gas, senior housing and transmission and distribution.

| Jan 8, 2013

PC Construction names McCarthy President/CEO

McCarthy, who joined PC Construction in 1998 and currently serves as executive vice president, will become a member of the employee-owned company’s board of directors and a trustee of the employee stock ownership plan.

| Jan 3, 2013

Answered prayers

A bold renovation enables a small church to expand its mission on a grand scale.

| Jan 2, 2013

M&A activity at U.S. AEC firms up slightly

Total mergers and acquisitions in the AEC industry hit 171 in 2012, up slight from the 169 deals in 2011.

| Jan 2, 2013

Construction jobs made gains in 2012, even with a slow Q4, says Gilbane report

The construction sector in the nine states with 50% of construction employment was up 169,000 jobs from February to September 2012, following a lost of 137,000 jobs from September 2011 to January 2012.

| Dec 21, 2012

ABI gains for fourth straight month

Positive business conditions for all building sectors.

boombox1
boombox2
native1

More In Category

Codes and Standards

New FEMA rules include climate change impacts

FEMA’s new rules governing rebuilding after disasters will take into account the impacts of climate change on future flood risk. For decades, the agency has followed a 100-year floodplain standard—an area that has a 1% chance of flooding in a given year.


Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021