flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The average U.S. contractor has 8.4 months worth of construction work in the pipeline, as of January 2024

Contractors

The average U.S. contractor has 8.4 months worth of construction work in the pipeline, as of January 2024

“As predicted, performance in the nonresidential construction sector is becoming more disparate across segments,” said ABC Chief Economist Anirban Basu. 


By Associated Builders and Contractors | February 13, 2024
The average U.S. contractor has 8.4 months worth of construction work in the pipeline, as of January 2024, Image by Hans from Pixabay
Image by Hans from Pixabay

Associated Builders and Contractors reported that its Construction Backlog Indicator declined to 8.4 months in January, according to an ABC member survey conducted from Jan. 22 to Feb. 4. The reading is down 0.6 months from January 2023.

Backlog increased to 10.9 months in the heavy industrial category, the highest reading on record for that category, and is 2.5 months higher than in January 2023. Backlog is down on a year-over-year basis in the commercial/institutional and infrastructure categories.

ABC’s Construction Confidence Index readings for sales and staffing levels increased in January, while the reading for profit margins declined. All three readings remain above the threshold of 50, indicating expectations for growth over the next six months.

“As predicted, performance in the nonresidential construction sector is becoming more disparate across segments,” said ABC Chief Economist Anirban Basu. “For much of the pandemic recovery period, contractors in virtually all segments were indicating stable to rising backlog. That remains the case for contractors most exposed to the nation’s industrial production. Reshoring and near-shoring continue to drive construction spending.

“In other categories, however, including those most interest rate-sensitive, activity appears to be slowing,” said Basu. “Developer financing has become both more expensive and more difficult to obtain over roughly the past year, in part because of rising office vacancy in many markets. That helps to explain declining backlog in the commercial category. The decline in infrastructure-related backlog may be due only to seasonality, however. There is every reason to believe that contractors specializing in public works will have a very busy year.”

Construction Backlog Indicator, Associated Builders and Contractors, January 2024

Related Stories

Codes and Standards | Apr 25, 2019

Report: Contractors invest $1.6 billion in workforce development annually

ABC members increased training spending 45% from 2013, according to a new report. 

Resiliency | Apr 22, 2019

Turner Construction doubles down on jobsite efficiency

The company targets a 50% cut in greenhouse gas emissions and water use from construction activities by 2030.

Building Tech | Apr 19, 2019

Skender, Z Modular reach agreement to fabricate multifamily housing components

Factory to open soon on the southwest side of Chicago.

Contractors | Apr 15, 2019

Do you have a fear of getting 'Uber'd'? Join the club

Exacerbating the AEC talent shortage is the coming mass exodus of baby boomers as they reach retirement age.

Contractors | Apr 15, 2019

Suffolk launches Smart Lab in Los Angeles

The lab will identify, test, and scale new technologies to help advance the construction industry.

Contractors | Apr 11, 2019

The construction industry has a problem, and women are going to solve it

Women currently comprise 9% of the construction industry. Here’s how we will change this to solve one of the industry’s most pressing issues.

Building Tech | Apr 8, 2019

Factory-based construction with no siloes starts with a single source of truth

Working from a single source of truth means every factor of design, procurement, manufacturing, and assembly will be accounted for before the assembly line is turned on.

Contractors | Apr 8, 2019

Employers at risk when using construction equipment not sized for women

As more women enter male-dominated fields, gear supply has not kept up with demand.

Mixed-Use | Apr 7, 2019

Chicago-area joint venture antes up $1 billion for Opportunity Zone development investment

Decennial Group says it’s looking at 250 potential projects, primarily in America’s heartland and rural areas.

AEC Tech | Jan 9, 2019

Our robotic future: Assessing AI's impact on the AEC profession and the built environment

This is the first in a series by Lance Hosey, FAIA, on how automation is disrupting design and construction.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021