flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The average U.S. contractor has 8.3 months worth of construction work in the pipeline, as of May 2024

Contractors

The average U.S. contractor has 8.3 months worth of construction work in the pipeline, as of May 2024

Contractor backlogs inched lower in May, according to Associated Builders and Contractors.


By Associated Builders and Contractors | June 12, 2024
Image by Denis Doukhan from Pixabay

Image by Denis Doukhan from Pixabay

Associated Builders and Contractors reported that its Construction Backlog Indicator fell to 8.3 months in May, according to an ABC member survey conducted May 20 to June 4. The reading is down 0.6 months from May 2023.

Backlog declined on a monthly basis for every company size except those contractors with greater than $100 million in annual revenues. On an annual basis, backlog is down for contractors of all sizes.

ABC’s Construction Confidence Index readings for profit margins and staffing levels fell slightly in May, while the reading for sales improved. All three readings remain above the threshold of 50, indicating expectations for growth over the next six months.

Associated Builders and Contractors reported that its Construction Backlog Indicator fell to 8.3 months in May,

“Over a year has passed since the Federal Reserve raised the target range of the federal funds rate above 5%," said ABC Chief Economist Anirban Basu. "Despite widespread expectations that rates will remain elevated through at least the end of the year, contractors remain confident about the future, with a majority of contractors expecting their sales and staffing levels to expand over the next six months.

“Although backlog has been lower in 2024 than it was during 2023, it has also been stable,” said Basu. “While significant spending activity in manufacturing and infrastructure-related segments has kept contractors busy, input cost escalation has reemerged in recent months. As a result, contractor confidence regarding profit margins has fallen to the lowest level since November 2023.”

Note: The reference months for the Construction Backlog Indicator and Construction Confidence Index data series were revised on May 12, 2020, to better reflect the survey period. CBI quantifies the previous month's work under contract based on the latest financials available, while CCI measures contractors' outlook for the next six months. View the methodology for both indicators.

View ABC’s Construction Backlog Indicator and Construction Confidence Index tables for May. View the full Construction Backlog Indicator and Construction Confidence Index data series.

Associated Builders and Contractors reported that its Construction Backlog Indicator fell to 8.3 months in May,

Associated Builders and Contractors reported that its Construction Backlog Indicator fell to 8.3 months in May,

Related Stories

| Apr 2, 2012

Sachse Construction helps complete Salt Lake City’s City Creek Center

Sachse was hired to complete store build-outs at City Creek Center.

| Apr 2, 2012

Culver joins Sasaki as managing director

Culver will work closely with Sasaki firm leaders on issues of strategy, marketing, and business development.

| Apr 2, 2012

EB-5 investment funds new Miramar, Fla. business complex

Riviera Point Holdings breaks ground on $17 million office center.

| Mar 30, 2012

New windows and doors revitalize older buildings

With their improved aesthetics, energy efficiency, and durability, replacement windows and doors can add significant value to a renovation project.

| Mar 30, 2012

18 handy tablet apps for AEC professionals

Check out these helpful apps for everyday design and construction tasks. Our favorite: MagicPlan, which uses GPS to help you measure and draw a floor plan of any room.

| Mar 29, 2012

U.K.’s Manchester Airport tower constructed in nine days

Time-lapse video shows construction workers on the jobsite for 222 continuous hours.

| Mar 29, 2012

Roller shade operating system wins IF Product Design Award

Design experts in the iF jury recognized the engineering invested in the RB 500 Roller Shade, including a metal clutch with a patented construction, a durable zamac housing with polished finish, and a chain drive unit that excels in maximum operating comfort.

| Mar 29, 2012

Lehigh engineering student wins Thornton Tomasetti Foundation Awards Scholarship

The scholarship is awarded annually to a graduate student in structural engineering deemed by the department to have the potential to make an impact in the field professionally.

| Mar 29, 2012

Construction completed on Las Vegas’ newest performing arts center

The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.

| Mar 29, 2012

Apartments provide permanent housing for California homeless

Gonzalez Goodale Architects designed complex to embrace community and engender sense of pride among residents.

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021