flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The average U.S. contractor has 8.3 months worth of construction work in the pipeline, as of May 2024

Contractors

The average U.S. contractor has 8.3 months worth of construction work in the pipeline, as of May 2024

Contractor backlogs inched lower in May, according to Associated Builders and Contractors.


By Associated Builders and Contractors | June 12, 2024
Image by Denis Doukhan from Pixabay

Image by Denis Doukhan from Pixabay

Associated Builders and Contractors reported that its Construction Backlog Indicator fell to 8.3 months in May, according to an ABC member survey conducted May 20 to June 4. The reading is down 0.6 months from May 2023.

Backlog declined on a monthly basis for every company size except those contractors with greater than $100 million in annual revenues. On an annual basis, backlog is down for contractors of all sizes.

ABC’s Construction Confidence Index readings for profit margins and staffing levels fell slightly in May, while the reading for sales improved. All three readings remain above the threshold of 50, indicating expectations for growth over the next six months.

Associated Builders and Contractors reported that its Construction Backlog Indicator fell to 8.3 months in May,

“Over a year has passed since the Federal Reserve raised the target range of the federal funds rate above 5%," said ABC Chief Economist Anirban Basu. "Despite widespread expectations that rates will remain elevated through at least the end of the year, contractors remain confident about the future, with a majority of contractors expecting their sales and staffing levels to expand over the next six months.

“Although backlog has been lower in 2024 than it was during 2023, it has also been stable,” said Basu. “While significant spending activity in manufacturing and infrastructure-related segments has kept contractors busy, input cost escalation has reemerged in recent months. As a result, contractor confidence regarding profit margins has fallen to the lowest level since November 2023.”

Note: The reference months for the Construction Backlog Indicator and Construction Confidence Index data series were revised on May 12, 2020, to better reflect the survey period. CBI quantifies the previous month's work under contract based on the latest financials available, while CCI measures contractors' outlook for the next six months. View the methodology for both indicators.

View ABC’s Construction Backlog Indicator and Construction Confidence Index tables for May. View the full Construction Backlog Indicator and Construction Confidence Index data series.

Associated Builders and Contractors reported that its Construction Backlog Indicator fell to 8.3 months in May,

Associated Builders and Contractors reported that its Construction Backlog Indicator fell to 8.3 months in May,

Related Stories

| Dec 9, 2012

BIM becomes VDC

A case study in disruption.

| Dec 9, 2012

Greenzone pop quiz

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

| Dec 9, 2012

Modular classroom building makes the grade

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

| Dec 9, 2012

14 great solutions

Welcome to the third installment of Building Design+Construction’s “Great Solutions,” highlighting 14 innovative technologies and products that you can put to work in your next project.

| Dec 9, 2012

D’ambrosio joins BD+C’s editorial board

D’Ambrosio, a 2009 selection to the magazine’s “40 Under 40” galaxy of AEC superstars, holds a bachelor’s in architectural engineering from the Pennsylvania State University.

| Dec 9, 2012

AEC professionals cautiously optimistic about commercial construction in ’13

Most economists say the U.S. is slowly emerging from the Great Recession, a view that was confirmed to some extent by an exclusive survey of 498 BD+C subscribers whose views we sought on the commercial construction industry’s outlook on business prospects for 2013.

| Dec 6, 2012

Suffolk Construction awarded Phase Two of Boston’s Old Colony redevelopment project

Project team breaks ground on South Boston public housing project designed for energy efficiency.

| Dec 5, 2012

Gilbane publishes Winter 2012 construction economic report

Report outlines impact of recent events; predicts continued movement, while slow, toward recovery.

| Dec 5, 2012

Bernards selected to build new Merced, Calif. high school campus

Designed by BCA Architects, the $76 million, 220,000-ft project encompasses a total of nine buildings.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021