flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of August 2024

Contractors

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of August 2024

Contractor backlogs dipped slightly in August from the previous month, according to Associated Builders and Contractors.


By Associated Builders and Contractors | September 10, 2024
Image by Thomas from Pixabay - The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of August 2024

Image by Thomas from Pixabay

Associated Builders and Contractors reported today that its Construction Backlog Indicator fell to 8.2 months in August, according to an ABC member survey conducted Aug. 20 to Sept. 5. The reading is down 1.0 months from August 2023.

View ABC’s Construction Backlog Indicator and Construction Confidence Index tables for August. View the full Construction Backlog Indicator and Construction Confidence Index data series.

Only the infrastructure category experienced a monthly increase in backlog among the three major segments, reflecting strength in public construction spending. Nonetheless, over the past year, backlog has declined in all three segments.

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of August 2024

ABC’s Construction Confidence Index readings for sales, profit margins and staffing levels fell in August. The readings for sales and staffing levels remain above the threshold of 50, indicating expectations for growth over the next six months, while the reading for profit margin expectations fell below that threshold.

“As predicted, confidence among contractors is slipping,” said ABC Chief Economist Anirban Basu. “While ABC contractor members are still anticipating expanding sales and employment, profits margins are increasingly under pressure as project owners face high borrowing and construction delivery costs in the context of a slowing economy. Many projects have been postponed, resulting in recent backlog declines, most notably in the South.”

Related Stories

| Nov 17, 2014

Nearly two years after Sandy Hook, the bloodshed continues

It’s been almost two years since 20 first-graders were shot and killed at Sandy Hook Elementary School in Newtown, Conn., but these incidents, both planned and random, keep occurring, writes BD+C's Robert Cassidy.

| Nov 17, 2014

Hospitality at the workplace: 5 ways hotels are transforming the office

During the past five years, the worlds of hospitality and corporate real estate have undergone an incredible transformation. The traditional approach toward real estate asset management has shifted to a focus on offerings that accommodate mobility, changing demographics, and technology, writes HOK's Eva Garza.

| Nov 17, 2014

Developments in 3D printing can assist architecture in the smallest details

Researchers at the Department of Energy’s Oak Ridge National Laboratory (ORNL) have developed a way for 3D printed metals to be produced with an unprecedented degree of precision.

| Nov 17, 2014

A new BSL-3 public-safety lab debuts in Vermont

The laboratory will be used to perform a wide range of analyses to detect biological, toxicological, chemical, and radiological threats to the health of the population, from testing for rabies, West Nile, pertussis and salmonella to water and food contaminants.

| Nov 17, 2014

Workplace pilot programs: A new tool for creating workspaces employees love

In a recent article for Fast Company, CannonDesign's Meg Osman details how insurance giant Zurich used a workplace pilot program to empower its employees in the creation of its new North American headquarters.

| Nov 17, 2014

Mastering natural ventilation: 5 crucial lessons from design experts

By harnessing natural ventilation, Building Teams can achieve a tremendous reduction in energy use and increase in occupant comfort. Engineers from SOM offer lessons from the firm’s recent work.

| Nov 14, 2014

Bjarke Ingels unveils master plan for Smithsonian's south mall campus

The centerpiece of the proposed plan is the revitalization of the iconic Smithsonian castle.

| Nov 14, 2014

What college students want in their living spaces

In a recent workshop with 62 college students, architects from Little explored the changing habits and preferences of today's students, and how those changes affect their living spaces.

Sponsored | | Nov 12, 2014

Eye-popping façade highlights renovation, addition at Chaffin Junior High School

The new distinctive main entrance accentuates the public face of the school with an aluminum tube “baguette” system. 

Sponsored | | Nov 12, 2014

Williams Scotsman plugs into the jobsite

Many of our customers conduct important business from their temporary modular jobsite office and most require access to technology to get their job done effectively and efficiently. SPONSORED CONTENT

boombox1
boombox2
native1

More In Category


Giants 400

Top 150 Contractors for 2024

Turner Construction, Whiting-Turner Contracting Co., STO Building Group, DPR Construction, and Gilbane Building Company top Building Design+Construction's ranking of the nation's largest general contractors, CM at risk firms, and design-builders for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2024 Giants 400 Report.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021