flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Average age of U.S. school buildings is just under 50 years

K-12 Schools

Average age of U.S. school buildings is just under 50 years

About half of schools have never had a major renovation


By Peter Fabris, Contributing Editor  | February 29, 2024
Photo by Mary Taylor

Photo by Mary Taylor

The average age of a main instructional school building in the United States is 49 years, according to a survey by the National Center for Education Statistics (NCES)

About 38% of schools were built before 1970. Roughly half of the schools surveyed have undergone a major building renovation or addition. Of those that have been renovated, the average age of the renovation was 14 years.

Major repair, renovation, or modernization work was being performed in 21% of all public schools surveyed as of December 2023. Indoor air quality is a major focus for many schools, with 39% having an indoor air quality coordinator on campus. This position is responsible for monitoring air quality conditions at the school and reporting air quality issues and complaints.

Some 60% of schools have designated vehicle loading and unloading areas at least 25 feet from all building air intakes, including doors and windows. Eighteen % of schools have an anti-idling program that includes signage and active monitoring during pick-up and drop-off times.

Some 31% of public schools have one or more non-permanent (portable) buildings in use.

Here are other findings from the NCES public school building survey:

The average age of the main instructional building is 49 years old. The following %ages of reporting public schools’ main instructional buildings were built during the following time periods:

  • Pre-1970: 38%
  • 1970 – 1999: 21%
  • 2000 – present: 20%

Nearly all public schools (93%) reported having some kind of athletic amenities on-site. The most commonly reported types of facilities were:

  • A gymnasium (69%)
  • All-purpose grass field (68%)
  • Outdoor basketball court (56%)
  • Baseball/softball field (38%)
  • Weight room (29%)
  • Outdoor track (28%)

Most public schools have dedicated library space available (89%).

Compared to the national estimate (89%), higher percentages of public schools with the following characteristics reported having dedicated library space available:

  • With 500-999 students (96%)
  • With a student body made up of 0-25% students of color (96%)
  • In rural areas (94%)
  • With 300-499 students (93%)
  • Elementary schools (93%)
  • In low-poverty neighborhoods (92%)

Compared to the national estimate (89%), lower percentages of public schools with the following characteristics reported having dedicated library space available:

  • In cities (84%)
  • In high-poverty neighborhoods (81%)
  • With a student body made up of 76% or more students of color (80%)
  • High/secondary schools (80%)
  • With 0-299 students (77%)

Related Stories

Sponsored | | Sep 4, 2014

Learning by design: Steel curtain wall system blends two school campuses

In this the new facility, middle school and high school classroom wings flank either side of the auditorium and media center. A sleek, glass-and-steel curtain wall joins them together, creating an efficient, shared space. SPONSORED CONTENT

| Sep 3, 2014

New designation launched to streamline LEED review process

The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.

| Sep 2, 2014

Ranked: Top green building sector AEC firms [2014 Giants 300 Report]

AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms. 

| Aug 27, 2014

Study looks at lessons from involving children in K-12 school design

A study examining what architects can learn from children, especially during the design process, is being carried out through the University of Sheffield's school of architecture. 

| Aug 14, 2014

8 do's and don'ts for completing an HVAC life cycle cost assessment

There are many hurdles to overcome when completing a life cycle cost assessment. RMF Engineering’s Seth Spangler offers some words of advice regarding LCCAs.

| Aug 14, 2014

Life cycle cost analysis using energy modeling

A life cycle cost analysis helps a school district decide which HVAC system to use in $198 million worth of future building projects.

| Aug 5, 2014

K-12 School Sector Giants: Pent-up demand finally produces movement in schools market [2014 Giants 300 Report]

After a long period of anemic performance, with growth mostly driven by renovations and additions, the K-12 sector is showing renewed interest in new construction, according to BD+C's 2014 Giants 300 Report.

| Jul 28, 2014

Reconstruction market benefits from improving economy, new technology [2014 Giants 300 Report]

Following years of fairly lackluster demand for commercial property remodeling, reconstruction revenue is improving, according to the 2014 Giants 300 report.

| Jul 28, 2014

Reconstruction Sector Construction Firms [2014 Giants 300 Report]

Structure Tone, Turner, and Gilbane top Building Design+Construction's 2014 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Engineering Firms [2014 Giants 300 Report]

Jacobs, URS, and Wiss, Janney, Elstner top Building Design+Construction's 2014 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

boombox1
boombox2
native1

More In Category

K-12 Schools

New K-12 STEM center hosts robotics learning, competitions in Houston suburb

A new K-12 STEM Center in a Houston suburb is the venue for robotics learning and competitions along with education about other STEM subjects. An unused storage building was transformed into a lively space for students to immerse themselves in STEM subjects. Located in Texas City, the ISD Marathon STEM and Robotics Center is the first of its kind in the district. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021