flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Autodesk agrees to acquire Horizontal Systems

Autodesk agrees to acquire Horizontal Systems

Acquisition extends and accelerates cloud-based BIM solutions for collaboration, data, and lifecycle management.


By By BD+C Staff | December 7, 2011
Autodesk purchases Horizontal Systems
The acquisition of Horizontal Systems will help accelerate the movement of BIM to the cloud.
This article first appeared in the January 2012 issue of BD+C.

Autodesk, Inc. signed a definitive agreement to acquire Horizontal Systems, a provider of innovative cloud-based Building Information Modeling (BIM) collaboration solutions for the Architecture, Engineering, and Construction (AEC) industry. The transaction is subject to customary closing conditions and is expected to close in Autodesk’s fourth quarter of fiscal 2012 (which ends on Jan. 31, 2012). Terms of the transaction were not disclosed.

Horizontal Systems technology is expected help accelerate Autodesk 360 for BIM capabilities by allowing multi-discipline teams to more easily communicate and synchronize information--helping reduce waste and errors during the design and construction of AEC projects and leading to faster, more efficient project delivery.

The acquisition of Horizontal Systems will help accelerate the movement of BIM to the cloud by providing users with the ability to more easily access and coordinate multi-discipline project data wherever and whenever it is needed throughout the entire project lifecycle. BD+C

Related Stories

| Sep 13, 2010

Second Time Around

A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.

| Sep 13, 2010

Palos Community Hospital plans upgrades, expansion

A laboratory, pharmacy, critical care unit, perioperative services, and 192 new patient beds are part of Palos (Ill.) Community Hospital's 617,500-sf expansion and renovation.

| Sep 13, 2010

China's largest single-phase hospital planned for Shanghai

RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase.

| Sep 13, 2010

Richmond living/learning complex targets LEED Silver

The 162,000-sf living/learning complex includes a residence hall with 122 units for 459 students with a study center on the ground level and communal and study spaces on each of the residential levels. The project is targeting LEED Silver.

| Sep 13, 2010

World's busiest land port also to be its greenest

A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.

| Sep 13, 2010

Triple-LEED for Engineering Firm's HQ

With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.

| Sep 13, 2010

Stadium Scores Big with Cowboys' Fans

Jerry Jones, controversial billionaire owner of the Dallas Cowboys, wanted the team's new stadium in Arlington, Texas, to really amp up the fan experience. The organization spent $1.2 billion building a massive three-million-sf arena that seats 80,000 (with room for another 20,000) and has more than 300 private suites, some at field level-a first for an NFL stadium.

| Sep 13, 2010

'A Model for the Entire Industry'

How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021