flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Autodesk agrees to acquire Horizontal Systems

Autodesk agrees to acquire Horizontal Systems

Acquisition extends and accelerates cloud-based BIM solutions for collaboration, data, and lifecycle management.


By By BD+C Staff | December 7, 2011
Autodesk purchases Horizontal Systems
The acquisition of Horizontal Systems will help accelerate the movement of BIM to the cloud.
This article first appeared in the January 2012 issue of BD+C.

Autodesk, Inc. signed a definitive agreement to acquire Horizontal Systems, a provider of innovative cloud-based Building Information Modeling (BIM) collaboration solutions for the Architecture, Engineering, and Construction (AEC) industry. The transaction is subject to customary closing conditions and is expected to close in Autodesk’s fourth quarter of fiscal 2012 (which ends on Jan. 31, 2012). Terms of the transaction were not disclosed.

Horizontal Systems technology is expected help accelerate Autodesk 360 for BIM capabilities by allowing multi-discipline teams to more easily communicate and synchronize information--helping reduce waste and errors during the design and construction of AEC projects and leading to faster, more efficient project delivery.

The acquisition of Horizontal Systems will help accelerate the movement of BIM to the cloud by providing users with the ability to more easily access and coordinate multi-discipline project data wherever and whenever it is needed throughout the entire project lifecycle. BD+C

Related Stories

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 16, 2012

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 

| Mar 16, 2012

Stego embarks on HPD Pilot Program

Vapor barrier manufacturer strives to provide better green choices to designers and builders.

| Mar 16, 2012

Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge

Architects in U.S. and abroad offered the chance to showcase their very best work.

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

| Mar 14, 2012

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.

| Mar 14, 2012

Plans for San Francisco's tallest building revamped

The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.

| Mar 14, 2012

Hyatt joins Thornton Tomasetti as VP in Chicago

A forensic specialist, Hyatt has more than 10 years of experience performing investigations of structural failures throughout the U.S.

| Mar 14, 2012

Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.

Building will house research into personalized, gene-based cancer screening and treatment.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021