Autodesk, Inc. signed a definitive agreement to acquire Horizontal Systems, a provider of innovative cloud-based Building Information Modeling (BIM) collaboration solutions for the Architecture, Engineering, and Construction (AEC) industry. The transaction is subject to customary closing conditions and is expected to close in Autodesk’s fourth quarter of fiscal 2012 (which ends on Jan. 31, 2012). Terms of the transaction were not disclosed.
Horizontal Systems technology is expected help accelerate Autodesk 360 for BIM capabilities by allowing multi-discipline teams to more easily communicate and synchronize information--helping reduce waste and errors during the design and construction of AEC projects and leading to faster, more efficient project delivery.
The acquisition of Horizontal Systems will help accelerate the movement of BIM to the cloud by providing users with the ability to more easily access and coordinate multi-discipline project data wherever and whenever it is needed throughout the entire project lifecycle. BD+C
Related Stories
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.
| May 23, 2012
MBI Modular Construction Campus Launched on BDCUniversity.com
White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.