Autodesk, Inc. signed a definitive agreement to acquire Horizontal Systems, a provider of innovative cloud-based Building Information Modeling (BIM) collaboration solutions for the Architecture, Engineering, and Construction (AEC) industry. The transaction is subject to customary closing conditions and is expected to close in Autodesk’s fourth quarter of fiscal 2012 (which ends on Jan. 31, 2012). Terms of the transaction were not disclosed.
Horizontal Systems technology is expected help accelerate Autodesk 360 for BIM capabilities by allowing multi-discipline teams to more easily communicate and synchronize information--helping reduce waste and errors during the design and construction of AEC projects and leading to faster, more efficient project delivery.
The acquisition of Horizontal Systems will help accelerate the movement of BIM to the cloud by providing users with the ability to more easily access and coordinate multi-discipline project data wherever and whenever it is needed throughout the entire project lifecycle. BD+C
Related Stories
| Aug 28, 2012
McCarthy begins construction on transportation center at Bob Hope Airport
Designed to meet LEED silver certification standards, the facility will feature unique, above ground base isolators that will resist a maximum credible earthquake.
| Aug 28, 2012
Wisnewski Blair & Associates changes name to HGA Mid-Atlantic
New name reflects firm's growing design resources on East Coast.
| Aug 24, 2012
Meis heads to Woods Bagot Sport
Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.
| Aug 21, 2012
Under 40 Leadership Summit slated for October 3-5 in Chicago
Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.
| Aug 21, 2012
Hong Kong’s first LEED Platinum pre-certified building opens
Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.
| Aug 21, 2012
Stellar wins four ABC Excellence In Construction awards
ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.
| Aug 20, 2012
Protecting the artifacts at George H.W. Bush Presidential Library and Museum
Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.
| Aug 17, 2012
Ferreri joins PGAL as Principal
Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.
| Aug 17, 2012
Centric Architecture and PLAD Studio merge
The new firm will retain Centric Architecture as its name.
| Aug 15, 2012
MBH Architects announces new appointments
MBH Architects continues to grow, take on new clients.