The Living, David Benjamin's design studio, has been acquired by Autodesk. Combined, the two will create the Autodesk Studio (part of Autodesk Research), which will "create new types of buildings, public installations, prototypes and architectural environments," Autodesk's blog states.
The Living has seven staff members at the moment, as well as a handful of part-time collaborators. Benjamin's area of specialty is synthetic biology, though he's been collaborating with Autodesk for years in the fields of architecture, art, and computer science.
Some projects the studio is currently working on include a university center for research on robotics and color-changing mussels that track water quality in New York's East River.
Hy-Fi, The Living's latest project (and a collaboration with Autodesk), was released last week at MoMA. The project will provide seating, shade and water while creating almost no waste for the 2014 Warm Up summer music program. It will be composted at the end of the summer.
Of the acquisition, Benjamin says: “This will enable The Living to do more of what we are already doing and supercharge it.” Take a look at Hy-Fi below to see what he means.
Related Stories
| Mar 2, 2012
By the Numbers
66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game; 21,000 new jobs.
| Mar 1, 2012
Intelligent construction photography, not just pretty pictures
Our expert tells how to organize construction progress photos so you don’t lose track of all the valuable information they contain.
| Mar 1, 2012
AIA: A clear difference, new developments in load-bearing glass
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Mar 1, 2012
8 tips for architects to consider before LED installation
Lighting experts offer Building Team members critical information to consider before upgrading lighting systems to LEDs.
| Mar 1, 2012
Reconstruction Awards: Reinvesting in a neighborhood’s future
The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Aragon Construction completes 67,000-sf build-out in NYC
Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.