BOKA Powell LLC announced today that a new full-service sustainable apartment development called "RiverView" near downtown Austin is under construction. The complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.
BOKA Powell provided the planning, architectural design and interior design services for this 280,000-sf project, which includes 302 apartments, luxury amenities including a fitness center, resort-style pool, resident lounge, demonstration kitchen and business center, as well as access to hiking/biking trails. Four contemporary buildings ranging from five to 11 stories are clustered around a lushly landscaped courtyard and pool deck.
Clad with a mix of local brick, stucco, and metal panels, the exterior design is a juxtaposition of old and new. Soaring roof planes unify the buildings and focus the orientation of the project toward Lady Bird Lake.
The project is designed to be a model for green development and is seeking a LEED Silver rating. Green features include water-saving plumbing fixtures, low-VOC finishes, local and recycled materials, and preferred parking for fuel efficient vehicles.
Storm water entering the site is collected and stored in an underground cistern for irrigation of native plants.
RiverView is the first high-rise residential development south of the Lake in Austin.
The project will provide an improved hike and bike trail along Riverside Drive, and public access to the planned boardwalk along Lady Bird Lake.
Dallas-based CDK Realty Advisors LP provided the equity for this project. Southern Cross Constructions is the construction contractor, and The Whitworth Company is providing project management services. BD+C
Related Stories
| Feb 29, 2012
Report says BIPV glass market to reach $6.4 billion by 2016
The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.
| Feb 29, 2012
Construction begins on Keller Army Community Hospital addition
The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.
| Feb 29, 2012
Carvalho appointed Shawmut Safety Director
He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system.
| Feb 29, 2012
Shepley Bulfinch selected to design new Children’s Hospital of Buffalo
The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.
| Feb 28, 2012
Roofing contractors recognized for workmanship
Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.
| Feb 28, 2012
Waste Management awards companies for sustainable construction
This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.