BOKA Powell LLC announced today that a new full-service sustainable apartment development called "RiverView" near downtown Austin is under construction. The complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.
BOKA Powell provided the planning, architectural design and interior design services for this 280,000-sf project, which includes 302 apartments, luxury amenities including a fitness center, resort-style pool, resident lounge, demonstration kitchen and business center, as well as access to hiking/biking trails. Four contemporary buildings ranging from five to 11 stories are clustered around a lushly landscaped courtyard and pool deck.
Clad with a mix of local brick, stucco, and metal panels, the exterior design is a juxtaposition of old and new. Soaring roof planes unify the buildings and focus the orientation of the project toward Lady Bird Lake.
The project is designed to be a model for green development and is seeking a LEED Silver rating. Green features include water-saving plumbing fixtures, low-VOC finishes, local and recycled materials, and preferred parking for fuel efficient vehicles.
Storm water entering the site is collected and stored in an underground cistern for irrigation of native plants.
RiverView is the first high-rise residential development south of the Lake in Austin.
The project will provide an improved hike and bike trail along Riverside Drive, and public access to the planned boardwalk along Lady Bird Lake.
Dallas-based CDK Realty Advisors LP provided the equity for this project. Southern Cross Constructions is the construction contractor, and The Whitworth Company is providing project management services. BD+C
Related Stories
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.