BOKA Powell LLC announced today that a new full-service sustainable apartment development called "RiverView" near downtown Austin is under construction. The complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.
BOKA Powell provided the planning, architectural design and interior design services for this 280,000-sf project, which includes 302 apartments, luxury amenities including a fitness center, resort-style pool, resident lounge, demonstration kitchen and business center, as well as access to hiking/biking trails. Four contemporary buildings ranging from five to 11 stories are clustered around a lushly landscaped courtyard and pool deck.
Clad with a mix of local brick, stucco, and metal panels, the exterior design is a juxtaposition of old and new. Soaring roof planes unify the buildings and focus the orientation of the project toward Lady Bird Lake.
The project is designed to be a model for green development and is seeking a LEED Silver rating. Green features include water-saving plumbing fixtures, low-VOC finishes, local and recycled materials, and preferred parking for fuel efficient vehicles.
Storm water entering the site is collected and stored in an underground cistern for irrigation of native plants.
RiverView is the first high-rise residential development south of the Lake in Austin.
The project will provide an improved hike and bike trail along Riverside Drive, and public access to the planned boardwalk along Lady Bird Lake.
Dallas-based CDK Realty Advisors LP provided the equity for this project. Southern Cross Constructions is the construction contractor, and The Whitworth Company is providing project management services. BD+C
Related Stories
| Oct 4, 2012
Foundation tightens HMC Architects bond with local communities
Founded in 2009 with an initial endowment of $1.9 million, HMC’s nonprofit Designing Futures Foundation (DFF) has donated about $230,000 in its three years of existence, including $105,000 in scholarships to California students. The grants help promising high schoolers with an interest in architecture, design, engineering, education, or healthcare pay for expenses like test preparation services, computers, and college entrance exam fees and tuition. The scholarships can be extended for up to five years of college.
| Oct 4, 2012
Gilbane publishes Fall 2012 construction industry economic report
Report outlines fluctuation in construction spending; predicts continued movement toward recovery.
| Oct 3, 2012
Fifth public comment period now open for update to USGBC's LEED Green Building Program
LEED v4 drafts and the public comment tool are now available on the newly re-launched, re-envisioned USGBC.org website.
| Oct 2, 2012
Mirvish and Gehry unveil conceptual design to transform Toronto’s entertainment district
Reimagining of King Street Entertainment District supports Toronto’s cultural corridor.
| Oct 2, 2012
Dow Business Services Center building named 2012 “America’s Best Buildings of the Year” winner
Building constructed with air sealing and insulation products from Dow Building Solutions.
| Oct 2, 2012
Bernards working on project at L.A. White Memorial Medical Center
The new facility is a $15-million, 41,000-sf concrete structure which includes three stories of medical office space atop a three-level parking garage.
| Oct 1, 2012
Tyco completes separation process, now largest pure-play fire protection and security business
Tyco Integrated Security focused on delivering security solutions to commercial businesses.
| Sep 28, 2012
Seattle is home to first LEED-certified modular radiation center
By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.
| Sep 26, 2012
EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue
Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.
| Sep 24, 2012
Reed Construction completes Lafarge headquarters in Chicago
Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.